|
g. Hollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, Hollywood, , , ,
<br />FloridaFloridaFloridaFlorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Strategic beach management planning services provided to the City of Hollywood and Hollywood Beach CRA for immediate
<br />erosional hot spot management and potential longer-term solutions for beach stabilization. Analyzed survey data and
<br />creation of base map.
<br />h.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />GIS analysis for report produced to develop a Stormwater Master Plan (SWMP) consistent with Miami-Dade County’s Master
<br />Plan. Analyzed survey data and creation of base map.
<br />i.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />MiamiMiamiMiamiMiami----Dade County Morphological Change Study, MiamiDade County Morphological Change Study, MiamiDade County Morphological Change Study, MiamiDade County Morphological Change Study, Miami----
<br />Dade CountyDade CountyDade CountyDade County, , , , FloridaFloridaFloridaFlorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2007 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Study of volumetric and morphological changes between Bakers Haulover Inlet and Government Cut with detailed analysis
<br />on the performance of the 32nd Street Breakwater Project. Establishment of regional GIS database for beach management
<br />and update of regional sediment budget with survey data between 1980 and 2004. Prepared recommendations for further
<br />hot-spot stabilization and backpassing beach management County-wide. Analyzed survey data and creation of base map.
<br />j.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Peanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach County, , , ,
<br />FFFFloridaloridaloridalorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2004 2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3-acre shallow seagrass lagoon. Additional
<br />features include a tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian boardwalks, and site
<br />utility upgrades. Analyzed survey data and creation of base map.
<br />k.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Pier 66 Pier 66 Pier 66 Pier 66 Marina, Ft. LauderdaleMarina, Ft. LauderdaleMarina, Ft. LauderdaleMarina, Ft. Lauderdale, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Planning and design of 60-slip mega-yacht marina facility. Design of upland excavation and basin dredging, including
<br />material handling and disposal design. Design of bulkhead improvements and associated shore-support structures, along
<br />with a portion of fixed docks. Analyzed survey data and creation of base map.
<br />l.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Seawall Seawall Seawall Seawall Maintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />GIS Analyst, evaluated 74 seawall structures that had not been repaired or replaced, and condition ratings were assigned to
<br />these structures. An assessment protocol was developed that included the collection of attributes such as the type,
<br />configuration, presence of outfall(s), condition and dimensions along with photographs of each structure. A database was
<br />developed using Microsoft Access to manage the field data collection and to produce the required reports from queries. The
<br />City was provided with the digital files for import into their GIS to be maintained as seawalls are replaced. Analyzed survey
<br />data and creation of base map.
<br />m.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Village of Key Biscayne Beach ManagementVillage of Key Biscayne Beach ManagementVillage of Key Biscayne Beach ManagementVillage of Key Biscayne Beach Management, , , , Key Biscayne, Key Biscayne, Key Biscayne, Key Biscayne,
<br />FloridaFloridaFloridaFlorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012 2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and
<br />hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys.
<br />Analyzed survey data and creation of base map.
<br />
<br />Page 46
|