My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:42:55 AM
Creation date
8/21/2020 10:42:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal Title: City of Sunny Isles Beach Continuing Services RFQ Ardaman & Associates, Inc. <br /> STANDARD FORM 330 (6/2004) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPEREINCE <br />Evelio N. Horta, Ph.D, P.E, <br />G.E <br />Geotechnical Engineer a. Total <br />44 <br />b. With Current Firm <br />26 <br />15. FIRM NAME AND LOCATON (City and State) <br />Ardaman & Associates, Inc., 2608 W. 84th St, Hialeah, Florida 33016 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS Civil Engineer <br />MS Civil Engineer <br />Ph.D., Geotechnical Engineer <br /> <br />Florida Professional Engineer No. 46625 <br />California Professional Engineer No. 77531 <br />California Geotechnical Engineer No. 2976 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FPL Greynolds Substation, 2405 Sunny Isles Blvd <br /> <br />PROFESSIONAL <br />SERVICES <br />2019 <br />CONSTRUCTION (if <br />applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms <br />Dr. Horta served as Senior Project Engineer for this project which included SPT borings down to 50 feet to evaluate soil <br />conditions and provide drilled shaft recommendations for foundation design for a new FPL transmission pole. Ardaman <br />Fees: $3,639.82 <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />I-20 Bridge at the Mississippi River, Louisiana-Mississippi DPT <br />2012-Present <br />2012-present CONSTRUCTION (if <br />applicable) <br /> <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms <br />The I-20 Bridge has been suffering displacements along the bridge alignment related to foundation movements on the <br />Mississippi side of the river. Dr. Horta serves as Senior Geotechnical Engineer in charge of the numerical modeling of the <br />river bluff and bridge foundations included within the 1800 x 2000 feet area of the Mississippi River. The analysis is being <br />performed using two and three-dimensional numerical methods to provide repair and stabilization recommendations. <br />Ardaman Fees: $3,000,000.00 <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Haulover Park Marina, Miami Beach, Florida PROFESSIONAL <br />SERVICES <br />2011-2015 <br />CONSTRUCTION (if <br />applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms <br />Dr. Horta served as senior geotechnical engineer for this study, which explored subsurface conditions in order to evaluate <br />soil conditions for a butler-type building and a new bulkhead at Haulover Park Marinas SPT borings were completed to <br />depths from 40 to 80 feet. Twelve SPT’s were done on land and 3 SPT’s were done in the water. Recommendations were <br />made for the bulkhead, the new building, and a related platform for forklift operations. Ardaman Fees Approx. $45,000.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />FPL transmission poles on NE 163 St Bridge, at NE 26 Ave & Oleta River, <br />Sunny Isles <br />2018 CONSTRUCTION (if <br />applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE check if project performed with current firms <br />Dr. Horta served as Senior Project Engineer for this project which included SPT borings down to 50 feet to evaluate soil <br />conditions and provide drilled shaft recommendations for foundation design for 4 new FPL transmission poles. Ardaman <br />Fees: $11,279.60 <br /> <br />Page 47
The URL can be used to link to this page
Your browser does not support the video tag.