My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:42:55 AM
Creation date
8/21/2020 10:42:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Rene I. Basulto, Principal <br />Basulto & Associates, Inc. Consulting Engineers Miami Lakes, Florida <br />Florida International University: College of Engineering & <br />Applied Sciences - Degree: Bachelor of Science in Mechanical <br />Engineering - Certification: Heating, Ventilation and Air <br />Conditioning Miami-Dade Community College - Major: <br />Associates in Arts Engineering Degree <br />Certified in Plumbing Design (CIPE/CPD) - Certified Plant Engineer (CPE) #4495 - LEED Accredited Professional #1034966 <br />Registered Mechanical Inspector #1239 - Registered Mechanical Plans Examiner #476 <br />South Dade Cultural Arts Center <br />Miami, FL <br />Mechanical, Electrical, Plumbing and Fire Protection design for 1,500 <br />seat theater building and adjoining multi-purpose building. <br />Design for replacement of existing electrical generator. <br />$1,500,000.00 <br />Clubhouse Mechanical, Electrical, Fire Protection and Plumbing design and drafting. Parking lot lighting design and <br />drafting. <br />Construction Administration to include: (8) site visits during construction, response to RFI’s and Shop Drawing Review. <br />Updating the site background on our plans and to modify the parking lot lighting design and photometric to accommodate <br />with changes due to existing environmental issues on site. This job is now required to have a “mat” placed over the <br />existing soils and an additional 12 inches of soil added to the site on top of that and then soded. The pool deck elevation <br />and the parking lot elevation will remain unchanged. However, they will be rising the finished floor elevation at the pool e <br />Construction Documents: -Site Visits -Electrical & Plumbing Design & Drafting for one park shelter <br />Construction Administration -pre-bid meeting -pre construction meeting -2 inspections during construction -final <br />inspection -show drawing review -response to RFIs <br />Medical Examiner Building (Emergency Generator) <br />Optimist Park Clubhouse, Miami Lakes, FL <br />Curtis Park Pool, Miami FL <br />Domino Park, Miami Beach , FL <br />State of Florida: <br />Professional Engineer # 40869 <br />General Contractor #CG-C060225 <br />Certified Plans Examiner #PX-0001324 <br />Certified Inspector # BN-0003018 <br />Principal-in-charge 39 26 <br />2006-2009 2010 <br />2014-2017 N/A <br />2010-2015 <br />N/A2010-2014 <br />N/A2015 <br />N/A <br />Page 48
The URL can be used to link to this page
Your browser does not support the video tag.