Laserfiche WebLink
STANDARD FORM 330 (8/2016) PAGE 3 <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20.EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br /> <br /> <br />21. TITLE AND LOCATION (City and State) <br />Maurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, Florida <br /> <br />22. YEAR COMPLETED <br /> PROFESSIONAL SERVICES <br />2019 <br /> <br /> CONSTRUCTION (If applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami <br />Capital Improvements Program <br />444 SW 2nd Avenue, 8th Floor <br />Miami, Florida 33130 <br /> <br /> b. POINT OF CONTACT NAME <br />Mr. John De Pazos <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />Tel: (305) 416-1094 <br />Email: jdepazos@miamidade.gov <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Coastal Systems led a multi-disciplinary team in the design of 24 <br />acres of Maurice A. Ferré Park. Maurice A. Ferré Park was <br />planned by the City of Miami as a waterfront revitalization in the <br />heart of downtown on Biscayne Bay. The $11.5M park <br />incorporates a waterfront promenade, Baywalk and plaza. <br /> <br />Coastal Systems provided civil engineering and environmental <br />permitting services. The stormwater management system consists <br />of a combination of exfiltration trenches, retention area within the <br />park, and outfalls to the bay. The stormwater system was <br />designed to meet the stringent guidelines for treating stormwater <br />runoff on-site for this waterfront park that is adjacent to the <br />environmentally sensitive Biscayne Bay. <br /> <br />An Environmental Resource Permit (ERP) was processed through <br />Miami-Dade County Regulatory and Economic Resources (RER) <br />for the stormwater management system. Coastal Systems also <br />prepared and processed the NPDES and FDOT permits for the <br />project. Potable water and sanitary sewer utility services were also designed for the Park. Service connections were coordinated with <br />Miami-Dade County WASD which included the preparation of documents for the service agreement with the City. Easements for the <br />new water lines, including fire hydrants, were established, <br />and designed. <br /> <br />Due to the site’s historical use as the original Port of Miami, <br />contaminated soils were present in the form of petroleum <br />and arsenic. Coastal Systems led the environmental team in <br />preparing a soil management plan to bring the site into <br />compliance and provide a clean and safe environment for <br />the public’s use. <br /> <br />The park’s Louis Poulsen light fixtures and Baywalk design <br />are now established as the design standard by the <br />Downtown Development Authority (DDA) for the proposed <br />City Baywalk-Riverwalk to encompass Biscayne Bay and <br />the Miami River. <br /> <br />Apart from the upland development, the large vessel <br />mooring facility, located within the existing basin adjacent to <br />the American Airlines Arena, was also designed and <br />permitted by Coastal Systems. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> a. <br />(1) FIRM NAME <br />Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. <br />(2) FIRM LOCATION <br />Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida <br /> (3) ROLE <br />PrimePrimePrimePrime <br />b. <br />(1) FIRM NAME <br />Gallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical Services, Inc., Inc., Inc., Inc. <br />(2) FIRM LOCATION <br />TamaracTamaracTamaracTamarac, Florida, Florida, Florida, Florida <br /> (3) ROLE <br />SubconsultantSubconsultantSubconsultantSubconsultant <br />c. <br />(1) FIRM NAME <br />Savino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design Studio, Inc., Inc., Inc., Inc. <br />(2) FIRM LOCATION <br />North MiamiNorth MiamiNorth MiamiNorth Miami, Florida, Florida, Florida, Florida <br /> (3) ROLE <br />SubconsultantSubconsultantSubconsultantSubconsultant <br />Civil Engineering <br />Stormwater Management <br />Utility Design <br />Construction Administration <br />Bidding <br />Environmental Permitting <br />Soil Management Plan <br />Coordination <br />RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: <br />CLIENT:CLIENT:CLIENT:CLIENT: City of Miami <br /> <br />PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2009 – 2019 <br /> <br />CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $11.5M <br />American Society <br />of Civil Engineers – <br />Civil Engineering <br />Project of the Year <br />(2014-2015) <br />Page 62