|
STANDARD FORM 330 (8/2016) PAGE 3
<br />
<br />
<br />
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
<br />QUALIFICATIONS FOR THIS CONTRACT
<br />(Present as many projects as requested by the agency, or 10 projects, if not specified.
<br />Complete one Section F for each project.)
<br />
<br />20.EXAMPLE PROJECT KEY
<br />NUMBER
<br />4
<br />
<br />
<br />21. TITLE AND LOCATION (City and State)
<br />Maurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, Florida
<br />
<br />22. YEAR COMPLETED
<br /> PROFESSIONAL SERVICES
<br />2019
<br />
<br /> CONSTRUCTION (If applicable)
<br />2019
<br />23. PROJECT OWNER’S INFORMATION
<br />a. PROJECT OWNER
<br />City of Miami
<br />Capital Improvements Program
<br />444 SW 2nd Avenue, 8th Floor
<br />Miami, Florida 33130
<br />
<br /> b. POINT OF CONTACT NAME
<br />Mr. John De Pazos
<br />
<br />c. POINT OF CONTACT TELEPHONE NUMBER
<br />Tel: (305) 416-1094
<br />Email: jdepazos@miamidade.gov
<br />
<br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
<br />
<br />Coastal Systems led a multi-disciplinary team in the design of 24
<br />acres of Maurice A. Ferré Park. Maurice A. Ferré Park was
<br />planned by the City of Miami as a waterfront revitalization in the
<br />heart of downtown on Biscayne Bay. The $11.5M park
<br />incorporates a waterfront promenade, Baywalk and plaza.
<br />
<br />Coastal Systems provided civil engineering and environmental
<br />permitting services. The stormwater management system consists
<br />of a combination of exfiltration trenches, retention area within the
<br />park, and outfalls to the bay. The stormwater system was
<br />designed to meet the stringent guidelines for treating stormwater
<br />runoff on-site for this waterfront park that is adjacent to the
<br />environmentally sensitive Biscayne Bay.
<br />
<br />An Environmental Resource Permit (ERP) was processed through
<br />Miami-Dade County Regulatory and Economic Resources (RER)
<br />for the stormwater management system. Coastal Systems also
<br />prepared and processed the NPDES and FDOT permits for the
<br />project. Potable water and sanitary sewer utility services were also designed for the Park. Service connections were coordinated with
<br />Miami-Dade County WASD which included the preparation of documents for the service agreement with the City. Easements for the
<br />new water lines, including fire hydrants, were established,
<br />and designed.
<br />
<br />Due to the site’s historical use as the original Port of Miami,
<br />contaminated soils were present in the form of petroleum
<br />and arsenic. Coastal Systems led the environmental team in
<br />preparing a soil management plan to bring the site into
<br />compliance and provide a clean and safe environment for
<br />the public’s use.
<br />
<br />The park’s Louis Poulsen light fixtures and Baywalk design
<br />are now established as the design standard by the
<br />Downtown Development Authority (DDA) for the proposed
<br />City Baywalk-Riverwalk to encompass Biscayne Bay and
<br />the Miami River.
<br />
<br />Apart from the upland development, the large vessel
<br />mooring facility, located within the existing basin adjacent to
<br />the American Airlines Arena, was also designed and
<br />permitted by Coastal Systems.
<br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br /> a.
<br />(1) FIRM NAME
<br />Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.
<br />(2) FIRM LOCATION
<br />Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida
<br /> (3) ROLE
<br />PrimePrimePrimePrime
<br />b.
<br />(1) FIRM NAME
<br />Gallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical Services, Inc., Inc., Inc., Inc.
<br />(2) FIRM LOCATION
<br />TamaracTamaracTamaracTamarac, Florida, Florida, Florida, Florida
<br /> (3) ROLE
<br />SubconsultantSubconsultantSubconsultantSubconsultant
<br />c.
<br />(1) FIRM NAME
<br />Savino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design Studio, Inc., Inc., Inc., Inc.
<br />(2) FIRM LOCATION
<br />North MiamiNorth MiamiNorth MiamiNorth Miami, Florida, Florida, Florida, Florida
<br /> (3) ROLE
<br />SubconsultantSubconsultantSubconsultantSubconsultant
<br />Civil Engineering
<br />Stormwater Management
<br />Utility Design
<br />Construction Administration
<br />Bidding
<br />Environmental Permitting
<br />Soil Management Plan
<br />Coordination
<br />RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES:
<br />CLIENT:CLIENT:CLIENT:CLIENT: City of Miami
<br />
<br />PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2009 – 2019
<br />
<br />CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $11.5M
<br />American Society
<br />of Civil Engineers –
<br />Civil Engineering
<br />Project of the Year
<br />(2014-2015)
<br />Page 62
|