Laserfiche WebLink
<br /> <br />STANDARD FORM 330 (8/2016) PAGE 3 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20.EXAMPLE PROJECT KEY <br />NUMBER <br />8 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Maurice GibbMaurice GibbMaurice GibbMaurice Gibb MemorialMemorialMemorialMemorial ParkParkParkPark, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida <br /> <br /> <br />22. YEAR COMPLETED <br /> PROFESSIONAL SERVICES <br />Ongoing <br /> <br /> CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami Beach <br />1700 Convention Center Drive <br />Miami Beach, Florida 33139 <br /> <br /> b. POINT OF CONTACT NAME <br />Ms. Colette Satchell <br /> <br /> c. POINT OF CONTACT TELEPHONE NUMBER <br />Tel: (305) 673-7071 ext. 6401 <br />Email: colettesatchell@miamibeachfl.gov <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Coastal Systems is leading a team of design professionals <br />in the implementation of Maurice Gibb Memorial Park, <br />located at 18th Street & Purdy Avenue. The City of Miami <br />Beach aims to create a one-of-a-kind park, honoring <br />Maurice Gibb of the Bee Gees, while incorporating <br />sustainable and resilient design features. <br /> <br />Coastal Systems developed the 2-acre park design while <br />incorporating community feedback through multiple <br />community meetings and workshops. The proposed <br />improvements will include an outlook platform, fishing <br />deck, shade structures, dog park, open sodded area, <br />landscape, and an ADA children's play area designed by <br />MONSTRUM, a custom playground manufacturer from <br />Denmark. <br /> <br />Coastal Systems is also designing a new seawall and enhancing the artificial reef by adding rip-rap, in order to create a living <br />shoreline and enhance water quality. The overwater deck and handrails will be designed using recycled materials. <br /> <br />Coastal Systems is providing the City with master planning, engineering design, environmental permitting, construction cost <br />estimates, bidding/award assistance, and construction administration services. Coastal Systems is also leading the environmental <br />sub-consultant to manage the testing and mitigation of contaminated soil at the site. <br /> <br />Environmental permits are being processed through Miami-Dade <br />County DERM, Florida Department of Environmental Protection, <br />National Pollutant Discharge Elimination System (NPDES), U.S. <br />Army Corps of Engineers and the City of Miami Beach. <br /> <br />As part of the City’s resiliency and sustainability initiatives, Coastal <br />Systems will consider and provide alternatives to incorporate into <br />the park’s design: <br /> <br />• Raising of the seawall to elevation +5.7’ NAVD to provide a <br />continuous flood barrier. <br />• Drainage system design using projected water levels in <br />anticipation of sea level rise. <br />• Soil management plan to replace/cap contaminated soils <br />associated with the historical land use of the site. <br /> Civil Engineering <br /> Stormwater Management <br /> Environmental Permitting <br /> Soil Management Plan <br />Coordination <br /> <br />RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: <br />CLIENT:CLIENT:CLIENT:CLIENT: City of Miami Beach <br /> <br />PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2017 – present <br /> <br />CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $6M (estimated) <br /> Coastal/Marine Engineering <br /> Bidding <br /> Construction Administration <br /> Public Meetings <br /> <br />Page 67