Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Mariia Romero <br />13. ROLE IN THIS CONTRACT <br />Staff Architect, Production <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />4 <br />b. WITH CURRENT FIRM <br />4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Construction of Building and Structures <br />College of Construction Industry <br />Saint-Petersburg, Russia – 2015 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />State Farmers Market Petroleum Lab and Tenant Building, <br />Pompano Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Petroleum Lab is a new 5,472 SF building with site improvements, offices and laboratory for the department of agriculture. Te nant <br />Building is a 6,778 SF office building for the department local offices and a future restaurant, including site improvements. Cost: <br />$3,562,000 Role: Staff Architect <br />b. <br />(1) TITLE AND LOCATION (City and State) Laboratory Building 53 Addition and Remodeling, University of Florida <br />Tropical Research and Education Center <br />Homestead, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Addition and remodeling to an existing laboratory building on an active campus. Construction Cost: $650,000 Role: Staff <br />Architect <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Coconut Creek Elementary School GOB Renovations, Coconut Creek, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Budget $3,800,000 - Design/Bid/Build - Project included replacing existing unit ventila tors in 42 classrooms, replacing existing <br />HVAC controls, remodeling of existing media center, remodeling existing restrooms, providing fire sprinklers, replacing exist ing <br />fire alarm systems and re-roofing of existing buildings. Role: Staff Architect <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Marjory Stoneman Douglas HS, Parkland, Fl <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Site adaptation for the installation of 32 modular classrooms, office modulars, including water, sewer, power, data, elevated <br />walkways, etc. A ll disciplines involved, underground utilities locating, surveying, geotechnical engineering, civil engineering, <br />structural, mechanical, electrical and plumbing engineering services. Construction Cost: $1.2M Role: Staff Architect <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />CM at Risk with Thornton Construction – Renovations at Timber Trace ES – <br />Palm Beach, Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CM at Risk Services included – ADA Compliance, Fire and Life Safety Upgrades, generator, fire alarm, duct detectors, etc. HVAC <br />upgrades, lighting improvements, storm drainage deficiencies, intercom and sound system replacement and exterior envelope <br />improvements Worked with owner’s team, end user (school) and local construction manager to obtain permits on time and on <br />budget! $3.5M Role: Staff Architect <br />Page 25