|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Metello Magistri
<br />13. ROLE IN THIS CONTRACT
<br />Staff Architect
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />21
<br />b. WITH CURRENT FIRM
<br />6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)Albo Professionale Degli Architelli de Roma, Rome, Italy
<br />Universita La Sapienza, Master in Architecture, Rome Italy
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />ALA – Assochitelli, Roma, Italy
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Indian Ridge Middle School, General Obligation Bond Renovations,
<br />Broward County, Florida (Part of an on-going/on-call cont' type contract)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project included music room renovations, conversion of existing space to a music room, art room renovations, HVAC
<br />improvements and building envelope improvement. $4.49M Role: Staff Architect
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />McFatter Technical Center, School Board of Broward County, Broward
<br />County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2007
<br />CONSTRUCTION (If applicable)
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project included renovations and additions to: restrooms including fire sprinklers. Role: Staff Architect
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lauderdale Lakes Middle School, General Obligation Bond Project,
<br />Lauderdale Lakes, FL (Part of an on-going/on-call cont' type contract)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided professional design services, improvements to campus, HVCC systems, Building envelope, Fire Alarm, Fire
<br />Sprinkler System and Media Center $4.4M Role: Staff Architect
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Assisted Living Facility – ALF Conversation, Lighthouse Point, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Conversation and remodeling of an existing multifamily facility to an Assisted Living Facility. The project is compliant with AHCA,
<br />Guidelines for Healthcare Design. 2,800 SF / $180K Role: Staff Architect
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Magnolia Charter School Remodeling, Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Remodeling of an existing 38,000 SF facility to convert to K-12 school, classrooms and offices. Project Cost: $1.9M Role: Staff Architect
<br />STANDARD FORM 330 (REV. 8/2016)
<br />Page 26
|