My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Mioris Cardona <br />13. ROLE IN THIS CONTRACT <br />Staff Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />17 <br />b. WITH CURRENT FIRM <br />7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)Master in Architecture, University of Miami, 2001 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Forest Hills Elementary School, School Board of Broward County, <br />Broward County, Florida (Part of an on-going/on-call cont' type contract) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (If applicable) <br />2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project included renovations to an existing Elementary School that included restroom remodeling/renovations. Upgrades to fire <br />sprinklers and fire alarm system. Role: Staff Architect <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />McFatter Technical Center, School Board of Broward County, Broward <br />County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (If applicable) <br />2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project included renovations and additions to: restrooms including fire sprinklers. Role: Staff Architect <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Griffin Elementary School, Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project included safety and security upgrades, Fire Alarm system Replacement, PE/Athletic improvements, and Media enter <br />Improvements. Role: Staff Architect <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Colbert Elementary School, School Board of Broward County, Broward <br />County, Florida (Part of an on-going/on-call cont' type contract) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project included the addition, remodeling of an existing Elementary School. The project also included HVAC Systems, <br />sprinklers, fire alarm system and parking. $8M Role: Staff Architect <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Magnolia Charter School Remodeling, Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Remodeling of an existing 38,000 SF facility to convert to K-12 school, classrooms and offices. Project Cost: $1.9M Role: Staff <br />Architect <br />STANDARD FORM 330 (REV. 8/2016) <br />Page 27
The URL can be used to link to this page
Your browser does not support the video tag.