|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Maria Siles
<br />13. ROLE IN THIS CONTRACT
<br />Staff Architect
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />6
<br />b. WITH CURRENT FIRM
<br />6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Architecture, Florida Atlantic University
<br />Association of Art in Architecture, Miami Dade College
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />State Requirements for Educational Facilities Certificates
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Indian Ridge Middle School, General Obligation Bond Renovations,
<br />Broward County, Florida (Part of an on-going/on-call cont' type contract)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project included music room renovations, conversion of existing space to a music room, art room renovations, HVAC
<br />improvements and building envelope improvement. $4.49M Role: Staff Architect
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Springs Middle School, Miami Springs, Florida (Part of an on-going/on-call cont' type contract)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Improvements to the campus HVAC Systems, Electrical system, Fire Alar, and Plumbing Improvements. Project also included
<br />building envelope Improvement. $3.4M Role: Staff Architect
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lauderdale Lakes Middle School, Lauderdale Lakes, Florida (Part of an on-
<br />going/on-call cont' type contract)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Rendering and drafting to provide professional design services, improvements to campus, HVAC Systems, Building envelop,
<br />Fire Alarm, Fire Sprinkler System and Media Center. $4.3M Role: Staff Architect
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />School Board Administration Building Design Criteria, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Services included renderings and drafting for the Design Criteria Package.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Magnolia Charter School Remodeling, Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Remodeling of an existing 38,000 SF facility to convert to K-12 school, classrooms and offices. Project Cost: $1.9M Role: Architect of
<br />Record
<br />STANDARD FORM 330 (REV. 8/2016)
<br />Page 28
|