Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Maria Siles <br />13. ROLE IN THIS CONTRACT <br />Staff Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />6 <br />b. WITH CURRENT FIRM <br />6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Architecture, Florida Atlantic University <br />Association of Art in Architecture, Miami Dade College <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />State Requirements for Educational Facilities Certificates <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Indian Ridge Middle School, General Obligation Bond Renovations, <br />Broward County, Florida (Part of an on-going/on-call cont' type contract) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project included music room renovations, conversion of existing space to a music room, art room renovations, HVAC <br />improvements and building envelope improvement. $4.49M Role: Staff Architect <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Springs Middle School, Miami Springs, Florida (Part of an on-going/on-call cont' type contract) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Improvements to the campus HVAC Systems, Electrical system, Fire Alar, and Plumbing Improvements. Project also included <br />building envelope Improvement. $3.4M Role: Staff Architect <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Lauderdale Lakes Middle School, Lauderdale Lakes, Florida (Part of an on- <br />going/on-call cont' type contract) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Rendering and drafting to provide professional design services, improvements to campus, HVAC Systems, Building envelop, <br />Fire Alarm, Fire Sprinkler System and Media Center. $4.3M Role: Staff Architect <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />School Board Administration Building Design Criteria, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Services included renderings and drafting for the Design Criteria Package. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Magnolia Charter School Remodeling, Sunrise, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Remodeling of an existing 38,000 SF facility to convert to K-12 school, classrooms and offices. Project Cost: $1.9M Role: Architect of <br />Record <br />STANDARD FORM 330 (REV. 8/2016) <br />Page 28