<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete One Section E for Each Key Person.)
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />19. RELEVANT PROJECTS
<br />a.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
<br />JENNA MARTINETTI, PE
<br />Calvin, Giordano & Associates, inc.
<br />B.S., Civil engineering, Magna Cum Laude Professional engineer Florida
<br />Fort Lauderdale, FL
<br />Florida State University, Tallahassee, FL No. 69035
<br />Ms. Martinetti has over 16 years of engineering experience designing and managing projects within many local municipalities. Her roadway
<br />design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood
<br />enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water
<br />pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the
<br />quality control process, and local agency program (LAP) coordination, including agency certification assistance. She has the advanced
<br />maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and LAP projects
<br />including Transportation Enhancement Program and CIGP. Her project management experience also includes design and retrofit of parks,
<br />roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and
<br />stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out.
<br />OVERALL PROJECT MANAGER 16 16
<br />Fronton Boulevard improvements
<br />Dania Beach, Florida
<br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a
<br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd
<br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent
<br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements
<br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and
<br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees -
<br />$766,000
<br />2013 - 2016 2016
<br />Davie Road Phase ii Corridor enhancements
<br />Davie, Florida
<br />Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median
<br />within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement
<br />marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP)
<br />funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design
<br />services for this federally funded project required close coordination with the FDOT and CEI team.
<br />2015 - 2018 2018
<br />Nova Drive Complete Streets improvements Project
<br />Davie, Florida
<br />Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor
<br />from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a
<br />roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans,
<br />MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and almost complete with construction.
<br />A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town
<br />Engineer: Jonathan Vogt, PE (954) 797-1137. Construction Cost: ($6.9M), Firm Fees: $459,475
<br />2014 - Ongoing 2020
<br />Page 31
|