Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />JENNA MARTINETTI, PE <br />Calvin, Giordano & Associates, inc. <br />B.S., Civil engineering, Magna Cum Laude Professional engineer Florida <br />Fort Lauderdale, FL <br />Florida State University, Tallahassee, FL No. 69035 <br />Ms. Martinetti has over 16 years of engineering experience designing and managing projects within many local municipalities. Her roadway <br />design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood <br />enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water <br />pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the <br />quality control process, and local agency program (LAP) coordination, including agency certification assistance. She has the advanced <br />maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and LAP projects <br />including Transportation Enhancement Program and CIGP. Her project management experience also includes design and retrofit of parks, <br />roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and <br />stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out. <br />OVERALL PROJECT MANAGER 16 16 <br />Fronton Boulevard improvements <br />Dania Beach, Florida <br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a <br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd <br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent <br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements <br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and <br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - <br />$766,000 <br />2013 - 2016 2016 <br />Davie Road Phase ii Corridor enhancements <br />Davie, Florida <br />Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median <br />within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement <br />marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) <br />funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design <br />services for this federally funded project required close coordination with the FDOT and CEI team. <br />2015 - 2018 2018 <br />Nova Drive Complete Streets improvements Project <br />Davie, Florida <br />Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor <br />from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a <br />roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, <br />MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and almost complete with construction. <br />A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town <br />Engineer: Jonathan Vogt, PE (954) 797-1137. Construction Cost: ($6.9M), Firm Fees: $459,475 <br />2014 - Ongoing 2020 <br />Page 31