My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 SARAh SiNATRA GOulD <br />Collins to harding Corridor Analysis <br />Surfside, Florida <br />Prepared an analysis and zoning criteria to help guide future development into the desired development pattern. Including a comparison <br />of existing conditions ,a review of traffic engineering standards, impacts to existing buildings and strategies for potential non-conformities <br />design criteria for pedestrian walkways and new zoning criteria. <br />2015 <br />General Planning <br />Medley, Florida <br />Prepared the Town’s EAR Amendments in 2009 and 2018. Act as the Town Planner including coordinate projects for development review <br />and provide information to the public. Additional Comprehensive Planning for the Town includes preparation of the Water Supply Facilities <br />Work Plan. <br />Page 45
The URL can be used to link to this page
Your browser does not support the video tag.