Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME <br />Vincent D. Yarina, PG <br />13. ROLE IN THIS CONTRACT <br />Principal/Vice President <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />28 <br />b. WITH CURRENT FIRM <br />21 <br />15. FIRM NAME AND LOCATION (City and State)Langan Engineering & Environmental Services , Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Pennsylvania State University, BS in Earth Science, 1992 <br />Drexel University, MS in Engineering Geology, 1999 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Professional Geologist in Florida (No. 2077) and Pennsylvania (No. 3260-E) <br />Certified Florida Environmental Assessor (No. 248) <br />Licensed Environmental Professional (No. 73) <br />Certified Environmental Manager in Nevada (No. 2104) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Fort Lauderdale/Hollywood International Airport, T-4 Remediation <br />Fort Lauderdale, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Mr. Yarina is serving as project manager for this project consisting of environmental services during utility construction in a petroleum-impacted area near the <br />western gate of the Fort Lauderdale/Hollywood International Airport. Langan’s services include Work Plan Development, Geotechnical Evaluation of Soil <br />Conditions, Soil Pre-Characterization, Well Installation & Abandonment, Open-excavation Air-sparging, and Environmental Observation During Construction. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />City of Pompano Beach Municipal Golf Course <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (if applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROL E Check if project performed with current firm. <br />Mr. Yarina managed the final closure plan and negotiations with Broward EPD for the arsenic contamination in soil and groundwater at the golf co urse. Mr. Yarina <br />managed the soil and groundwater investigation to determine the current status of the contamination in the soil and groundwater and conducted a statistica l <br />evaluation of all the soil sample data in an effort to reduce the amount of contaminated soil to be removed and disposed. Rem ediation activities are currently <br />being proposed for the site. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Sunny Isles Hydrogeological Investigation <br />Sunny Isles Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2006 <br />CONSTRUCTION (if applicable) <br />n/a <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Mr. Yarina served as overall project manager for the investigation of the variation of specific capacity in a 100 -acre area of Sunny Isles Beach, where the city was <br />redesigning the roadway drainage infrastructure; including installing additional deep stormwater drainage wells. The investigation comprised three Standard <br />Penetration Tests to 100 ft below grade, identification of potential production zones for the stormwater, and completion of specific capacity tests on those <br />production zones to estimate the volume flow (gallons per minute per foot of head) the city’s civil engineer should use for t he design of the drainage system. <br />Langan recommended design flow rates ranging from 400 gpm/ft to 700 gpm/ft. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Monroe County Landfill Groundwater Monitoring <br />Cudjoe Key, Long Key, and Key Largo, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (if applicable) <br />2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Management of the monitoring of the groundwater semi -annually at three county landfills – Cudjoe Key, Long Key, and Key Largo – as part of the county’s solid <br />waste permits from the Florida Department of Environmental Protection. The project involves collecting samples from 11 monito ring wells and one surface water <br />location. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Hallandale Beach, Drainage Improvements <br />Hallandale Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (if applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Langan provided hydrogeological services in support of the city’s plan to install pressurized right -of-way stormwater drainage wells to alleviate street flooding. <br />Langan’s scope of work included supervising five 150 -ft. test holes in the 120-acre Northeast Quadrant project area and five 200-ft. test holes in the 120-acre <br />Southwest Quadrant project area; evaluating geology and water quality (total dissolved solids); a nd performing a specific capacity test in potential production <br />zones in the Southwest Quadrant project area. Langan completed both project areas and provided reasonable assurance reports t hat met the requirements of <br />Chapter 62-528, Florida Administrative Code, as part of the permit package for the new stormwater drainage wells. <br />STANDARD FORM 330 (6/2004) <br />Page 64