|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />12. NAME
<br />Vincent D. Yarina, PG
<br />13. ROLE IN THIS CONTRACT
<br />Principal/Vice President
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />28
<br />b. WITH CURRENT FIRM
<br />21
<br />15. FIRM NAME AND LOCATION (City and State)Langan Engineering & Environmental Services , Miami Lakes, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Pennsylvania State University, BS in Earth Science, 1992
<br />Drexel University, MS in Engineering Geology, 1999
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Registered Professional Geologist in Florida (No. 2077) and Pennsylvania (No. 3260-E)
<br />Certified Florida Environmental Assessor (No. 248)
<br />Licensed Environmental Professional (No. 73)
<br />Certified Environmental Manager in Nevada (No. 2104)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Fort Lauderdale/Hollywood International Airport, T-4 Remediation
<br />Fort Lauderdale, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (if applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Mr. Yarina is serving as project manager for this project consisting of environmental services during utility construction in a petroleum-impacted area near the
<br />western gate of the Fort Lauderdale/Hollywood International Airport. Langan’s services include Work Plan Development, Geotechnical Evaluation of Soil
<br />Conditions, Soil Pre-Characterization, Well Installation & Abandonment, Open-excavation Air-sparging, and Environmental Observation During Construction.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Pompano Beach Municipal Golf Course
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (if applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROL E Check if project performed with current firm.
<br />Mr. Yarina managed the final closure plan and negotiations with Broward EPD for the arsenic contamination in soil and groundwater at the golf co urse. Mr. Yarina
<br />managed the soil and groundwater investigation to determine the current status of the contamination in the soil and groundwater and conducted a statistica l
<br />evaluation of all the soil sample data in an effort to reduce the amount of contaminated soil to be removed and disposed. Rem ediation activities are currently
<br />being proposed for the site.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Sunny Isles Hydrogeological Investigation
<br />Sunny Isles Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2006
<br />CONSTRUCTION (if applicable)
<br />n/a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Mr. Yarina served as overall project manager for the investigation of the variation of specific capacity in a 100 -acre area of Sunny Isles Beach, where the city was
<br />redesigning the roadway drainage infrastructure; including installing additional deep stormwater drainage wells. The investigation comprised three Standard
<br />Penetration Tests to 100 ft below grade, identification of potential production zones for the stormwater, and completion of specific capacity tests on those
<br />production zones to estimate the volume flow (gallons per minute per foot of head) the city’s civil engineer should use for t he design of the drainage system.
<br />Langan recommended design flow rates ranging from 400 gpm/ft to 700 gpm/ft.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Monroe County Landfill Groundwater Monitoring
<br />Cudjoe Key, Long Key, and Key Largo, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (if applicable)
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Management of the monitoring of the groundwater semi -annually at three county landfills – Cudjoe Key, Long Key, and Key Largo – as part of the county’s solid
<br />waste permits from the Florida Department of Environmental Protection. The project involves collecting samples from 11 monito ring wells and one surface water
<br />location.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hallandale Beach, Drainage Improvements
<br />Hallandale Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (if applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Langan provided hydrogeological services in support of the city’s plan to install pressurized right -of-way stormwater drainage wells to alleviate street flooding.
<br />Langan’s scope of work included supervising five 150 -ft. test holes in the 120-acre Northeast Quadrant project area and five 200-ft. test holes in the 120-acre
<br />Southwest Quadrant project area; evaluating geology and water quality (total dissolved solids); a nd performing a specific capacity test in potential production
<br />zones in the Southwest Quadrant project area. Langan completed both project areas and provided reasonable assurance reports t hat met the requirements of
<br />Chapter 62-528, Florida Administrative Code, as part of the permit package for the new stormwater drainage wells.
<br />STANDARD FORM 330 (6/2004)
<br />Page 64
|