Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Roger Simon <br />13. ROLE IN THIS CONTRACT <br />Staff Geologist <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />12 <br />b. WITH CURRENT FIRM <br />8 <br />15. FIRM NAME AND LOC ATION (City and State)Langan Engineering & Environmental Services, Fort Lauderdale, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.Sc., Geophysical Science, University of Chicago <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />40-hour OSHA Hazardous Waste Operations and Emergency Response Certificate <br />NIOSH 582 Microscopy <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19.RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Frost Science Museum <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />This project consisted of an environmental file review and baseline testing to support dewatering activities and permit appro val for the construction of the high- <br />profile project in former Bicentennial Park in downtown Miami, Florida. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Met 3, Metropolitan Development <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />This project consisted of a Phase I Environmental Assessment that revealed the presence of historical arsenic -impacted fill material. Subsequent <br />characterization using 95% Upper Confidence Limit statistical analysis resulted in delineation and disposal of over 400 tons of fill material from select areas and <br />decreased construction costs. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Biscayne Landing <br />North Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009-2011 <br />CONSTRUCTION (if applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Implemented Landfill Gas (LFG) Management System Monitoring for Residential and Commercial Structures. Mr. Simon performed landfill gas monitoring and <br />prepared numerous Landfill Gas Monitoring Report (GMR) to FDEP, the Miami -Dade Department of Environmental Resources Management (DERM) and Miami - <br />Dade Fire Rescue. Mr. Simon implemented the Surface Water and Groundwater Quality Monitoring Program for the site consisting of 83 monitoring wells and <br />30 surface water sampling locations. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PortMiami Tunnel <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Coordinated and collected historical groundwater and soil sampling data, assisted in the development of the soil management plan for large volumes of spoils <br />from tunnel boring operation, including the acquisition of confirmatory soil data for soil re -use and soil classification. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Monroe County Landfill Groundwater Monitoring <br />Cudjoe Key, Long Key, and Key Largo, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (if applicable) <br />n/a <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Responsible for the monitoring of groundwater semi -annually at three county landfills – Cudjoe Key, Long Key, and Key Largo – as part of the county’s solid <br />waste permits from the Florida Department of Environmental Protection. The project involves collecting samples from 11 monito ring wells and one surface <br />water location. <br />STANDARD FORM 330 (6/2004) <br />Page 65