Laserfiche WebLink
<br /> <br /> <br /> OWNER <br /> City of Fort Lauderdale <br /> CLIENT CONTACT <br /> ATKINS <br /> Humberto Alonso <br /> Southeast Florida Manager <br /> 2001 NW 107th Ave <br /> Doral, FL <br /> 305.514.3550 <br /> CONSTRUCTION COST <br /> N/A ($120,000 - Assessment Fee) <br />COMPLETION DATE November 2016 <br />DESCRIPTION <br />The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can <br />only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 <br />Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in <br />the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and <br />infrastructure should receive the most emphasis from City leaders over the next two years. As part of the <br />comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk <br />Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed <br />under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an <br />interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. <br />Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was <br />responsible for providing all of the field inspection and sidewalk condition assessment of the 420 miles of <br />city sidewalks. Work included the coordination and training of field staff in the use of project equipment, <br />such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization <br />and levels required by the project. Assessment included the identification of ADA non-conformances, <br />unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews <br />conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was <br />uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data <br />collected, reports and images. <br />Premiere Design Solution’s role in the project is: <br />Equipment Coordination and Staff Training <br />Project Scheduling and performance tracking <br />Existing sidewalk condition assessment using GPS and Camera Equipped data collectors <br />Assessment included ADA deficiencies and condition verification <br />QA/QC of data collected and Coordinated re-assessment of data as required <br />City of Fort Lauderdale <br />Citywide Sidewalk Assessment Program <br />Broward County, Florida <br />138