My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> OWNER <br /> Town of Miami Lakes <br /> <br /> CLIENT CONTACT <br /> Town of Miami Lakes <br /> <br /> Luis Sanchez <br /> Public Works Project Manager <br /> 15150 NW 79th Court <br /> Miami Lakes, FL 33016 <br /> 305-364-6100 <br /> <br /> CONSTRUCTION COST <br /> $220,000 <br /> <br /> COMPLETION DATE <br /> August 2014 <br /> <br />DESCRIPTION <br />Premiere Design Solutions, Inc. (PDS) served as the Topographic Surveyor and Engineering Consulting <br />firm for this project which included the field data collection, topographic survey, scope determination and <br />the generation of Demolition, New Construction, Pedestrian Crossing, Pavement Marking and Signage <br />and Maintenance of Traffic Plans. <br />Civil design included the design of pedestrian facility improvements such as concrete landing pads, <br />concrete shelter foundations, concrete sidewalk reconstruction, new ADA compliant pedestrian ramps, <br />new pedestrian crossing with solar rectangular rapid flashing beacon (RRFB) per FDOT standards, striped <br />pedestrian crossing, and work around schools. Project also included electrical drawings for the electrical <br />grounding of the proposed shelters and structural design of the shelter foundation. Project provided the <br />client with the design for ADA sidewalk improvements to 11 locations, new bus shelters, concrete pads, <br />sidewalks and amenities. Project included the coordination with the Town of Miami Lakes, Miami-Dade <br />Transit, and Miami-Dade Public Works as well as the underground utility investigations and permitting. <br />Project was federally funded and had strict budgetary constraints, especially in timing, since the project <br />had to be completed before the end of fiscal year. This forced this project to be a fast track project, and <br />delivered with great quality within the available budget, and most importantly within the necessary time- <br />frame. <br /> <br />Premiere Design Solution’s role in the project is: <br /> <br /> Conduct Pre-Construction visits to identify field conditions <br /> Conduct Topographic Surveys <br /> Prepared Civil, Electrical and Structural Drawings <br /> Design of Sidewalk Improvements <br /> Design of new pedestrian crossing with solar RRFB <br /> Obtain permits through the Miami Lakes Building Department and Miami-Dade County <br /> <br />Town of Miami Lakes <br />Pedestrian & Transit Improvements at 11 Locations <br />Miami Lakes, Florida <br /> <br />144
The URL can be used to link to this page
Your browser does not support the video tag.