My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br />OWNER <br />City of Dania Beach <br /> <br />CLIENT CONTACT <br />Ronnie Navarro, P.E. <br />City of Dania Beach <br />1201 Stirling Road <br />Dania Beach, FL <br /> <br />CONSULTING COST <br />$ 50,000 <br /> <br />COMPLETION DATE <br />2015 <br /> <br />DESCRIPTION <br /> <br />Taylor Lane is a 2,000 linear foot section of roadway located in the City of Dania Beach adjacent to the <br />Fort Lauderdale Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As <br />part of the development of the south runway extension at the airport, stormwater run-off was re-directed <br />and has adversely impacted Taylor Lane. This roadway provides the only access to the marinas located <br />on the north side of Dania Cut Off Canal west of US 1. <br /> <br />PDS provided design, permitting and engineering services during construction for the development of a <br />drainage system to help alleviate flooding of this roadway from stormwater run-off. The project was <br />designed by PDS and permits were obtained from the local governmental agencies. The PDS design <br />included the development of drainage improvements within the roadway and the development of a dry <br />retention area to collect the stormwater run-off from the roadway. PDS provided support in the contractor <br />selection and conducted engineering during construction services, including final inspection and closeout <br />of the project. PDS also coordinated with Broward County Aviation Department for the contractor <br />selection and ultimate completion of the improvements within a very aggressive time schedule. <br />The scope of work of this project included the following tasks: <br /> Coordination with County and Government to expedite the project <br /> Design and Permitting of the drainage system to help alleviate roadway flooding <br /> Design of the Drainage System to meet local drainage criteria <br /> Pavement Marking and Signage Design <br /> Provide Engineering Services during construction to certify the completion of the project <br /> <br />Premiere Design Solutions Staff’s role in the project was: <br /> <br /> General civil engineering services, including Paving and Drainage Infrastructure improvements, <br />stormwater management and grading design. <br /> Obtaining Engineering Permits for the project <br /> Construction Management and Engineering during construction services. <br />Taylor Lane Drainage Improvements <br />City of Dania Beach <br />Broward County, FL <br />C100PAVING, GRADING & DRAINAGE PLANSTAYLOR LANE DRAINAGE IMPROVEMENTSCITY OF DANIA BEACH150
The URL can be used to link to this page
Your browser does not support the video tag.