My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> OWNER <br /> City of Opa-Locka <br /> <br /> CLIENT CONTACT <br />C&I Construction and Design, Inc. <br /> <br />Aria Austin <br />Public Works Director <br />780 Fisherman Street, 4th Floor <br />Opa-Locka, FL 33054 <br />305-953-2868 <br /> <br />CONSTRUCTION COST <br />$1,475,000 <br /> <br />COMPLETION DATE <br />December 2013 <br /> <br /> <br /> <br />DESCRIPTION <br />Premiere Design Solutions, Inc. (PDS) served as the Design Engineer and Construction Managers for <br />this project to provide sanitary sewer upgrades and building rehabilitation to the master lift station in the <br />City of Opa-Locka responsible for the collection of all sanitary sewer flows in the city and routing them to <br />the receiving County pump station view a 12” force main. Project included the structural building <br />renovations, building hardening, completely new electrical system and pump controls, telemetry, <br />replacement of the three main pumps and the design of a standby emergency diesel operated pump. <br />The PDS professional staff has also been tasked with the permitting through the City and the Miami- <br />Dade County Environmental Agency. Project included design calculations for the three permanent <br />pumps, as well as the stand by Diesel pump. <br /> <br /> <br />Premiere Design Solution’s role in the project is: <br /> <br /> Conduct Pre-Construction visits to identify field problems early on. <br /> Civil, Structural, Mechanical and Electrical Engineering design <br /> Lift Station Calculations and Pump Selection <br /> Obtain permits through the Cities and Miami-Dade County. <br /> Perform periodic field visits to check progress of construction. <br /> Prepare monthly payment requisition packages, including updated project schedule, progress <br />photographs, and related documentation as required for Federally Funded Projects. <br /> Liaison between Cities, County and Contractor on any aspect related to this project. <br /> <br />City of Opa-Locka <br />Master Lift Station 11C - Upgrades and Rehabilitation <br />Opa-Locka, Florida <br /> <br />149
The URL can be used to link to this page
Your browser does not support the video tag.