Laserfiche WebLink
GUSTAVO ECKARDT, P.E. <br />Project Manager <br /> <br /> <br /> <br />ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, Florida - Mr. Eckardt was the <br />project manager and engineer of record for this project, which included the filed data collection, topographic survey, <br />scope determination, and the generation of demolition, new construction, and maintenance of traffic plans. Project <br />provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete <br />pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct <br />underground utility investigations and permitting. <br /> <br />Fort Lauderdale Airport Runway Expansion Project, Fort Lauderdale, FL - Mr. Eckardt was the Project Quality <br />Control Manager for the utility designs, relocations and coordination related to the FLL Runway Expansion project, <br />to expand the runway over US-1. Mr. Eckardt participated in the generation of engineering drawings for the design <br />of over 5,000 LF of 16” Water Main, and 4,000 LF of 12” Force Main for utility relocations required for this project. <br />The project also included the design of a shared communication duct bank to relocate communication utilities along <br />the corridor. Mr. Eckardt also assisted in the coordination efforts with over 20 Utility Companies with utilities along <br />this corridor that will also be impacted by this project which will need to be relocated. Utility companies included <br />AT&T, FPL, TECO, Comcast, FAA, Windstream, XO, CITGO, Buckeye Pipeline, Qwest, Verizon, Sprint, L3, etc. <br />Project also included the collection of as-built data and production of as-built drawings, and construction support <br />services. <br /> <br />Citywide Sidewalk Assessment, City of Fort Lauderdale, Florida - As part of the comprehensive effort to <br />address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program. The work <br />included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, <br />photo and GIS location, type, and length of damage. Mr. Eckardt assisted the client in the coordination of training <br />and field data collection of filed survey activities, and assisted field crews in the collection of data and assessing <br />the existing condition of miles of existing sidewalks and pedestrian curb ramps, generating GIS based condition <br /> <br />Ives Estates Park Youth Complex, Miami Dade Parks & Recreation, Miami, FL - Mr. Eckardt provided <br />construction administration for this project which consisted of infrastructure improvements to establish a new 94 acre <br />park and regional offices complex on the closed Ojus landfill. Project included construction of a roadway, lighted <br />asphalt parking lots, lighted Soccer field, lighted Baseball Field, playground area, sanitary sewer lift station, striping, <br />drainage and grading, water and sewer mains extension and irrigation system. Duties included design changes, <br />field visits, progress reports, responses to RFI’s, Shop Drawing review, change order review, negotiation meetings <br />& project close out. <br /> <br />Miami-Dade West Perrine Park, Miami Dade Parks & Recreation, Miami, FL - Mr. Eckardt served as Project <br />Engineer for the paving, grading, drainage design, and plans production for the addition of a new recreation center, <br />parking lot, and walkways for the West Perrine Park. Mr. Eckardt was also involved in the project administration and <br />field observation phase of this project conducting periodic field visits. Mr. Eckardt also served as Project Engineer <br />for the design of Phase II for this park, which includes a new Aquatic Recreational Facility, with slides, water splash <br />areas and recreational pools. Mr. Eckardt was responsible for the water, sewer and drainage design for this new <br />addition to this project. <br /> <br />Clubhouse / Restaurant for Melreese Golf Course, Miami, FL (LEED Silver Certification) - Mr. Eckardt was the <br />Project Manager for this project and provided civil engineering services for the design of a new Clubhouse at the <br />Melreese Golf Course that achieved a LEED Silver Certification. One of the design issues encountered is the existing <br />ash contamination at the site. Mr. Eckardt was also responsible for the water and sewer permitting as well as the <br />drainage and site sustainable design, all civil permitting and construction management. <br /> <br />Kendall Soccer Park, Miami-Dade County, Florida - Mr. Eckardt was the construction administration manager for <br />civil field inspections on the Kendall Soccer Park project. The major construction components of this project was the <br />installation of four new artificial turf soccer fields, construction of a new restroom facility, the construction of a new <br />parking lot, construction of a water main extension, new irrigation system interconnected to the existing system and <br />the resurfacing of the existing parking lot. Mr. Eckardt oversaw daily inspections of the construction activities and <br />daily reports that were provided to the client, to verify compliance with contract plans & specs. and also managed <br />the RFI log, change order log, and shop drawing log, and prepared periodic reports to the client. <br /> <br />158