Laserfiche WebLink
GUSTAVO ECKARDT, P.E. <br /> Project Manager <br /> <br /> <br />Miami-Dade Transit Department, ARRA Municipalities Shelters Groups “A & C”, Miami-Dade County, <br />Florida. The ARRA Municipalities Group “A & C” Transit Improvements projects consisted of two transit <br />improvement projects at over 70 locations throughout Miami-Dade County, in the Cities of Homestead, Florida City, <br />North Miami, North Miami Beach, Miami Lakes, Surfside, Bay Harbor Islands, Aventura, South Miami, Opa-Locka, <br />and El Portal. Project is Federally Funded and coordinated by the Miami-Dade Transit Department, and follows all <br />ARRA and Federal guidelines and regulations. Mr. Eckardt was the Construction Manager and Quality Control <br />representative in the project, and assisted in obtaining all permitting approvals from municipalities and county <br />agencies. Project included the ADA accessibility improvements to bus stop locations, new bus shelters and <br />amenities, new sidewalk and reinforced concrete pads, and the relocation of existing bus shelters. <br /> <br />FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design-Build <br />project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, <br />Oakland Park and Pompano Beach, in Broward County. Mr. Eckardt was the project manager responsible for <br />coordinating and generating civil, structural and electrical engineering designs for the bus shelters as well as <br />improvements at bus stops locations such as landing pads, curb & gutter, sidewalk restoration, sidewalk transitions, <br />and amenities. This project required the coordination between the design team consisting of civil engineers, <br />structural engineers, electrical engineers, shelter manufacturer and a surveying team. To ensure the best possible <br />product, this project closely followed a strict quality control procedure review prior to submittal and meeting with <br />governmental agencies having jurisdiction over the project site location. Project included all permitting, including <br />FDOT electronic reviews, and permit through municipalities & construction support services. <br /> <br />Miami Executive Airport RIM Taxiway Modifications, Miami-Dade Aviation Department, FL – Mr. Eckardt was <br />the project manager for this project to design modifications to the existing configuration of Taxiways “A” and “D” as <br />they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt also served as <br />the construction manager for this project and was responsible for inspections and construction coordination of <br />demolition work, new pavement, runway and taxiway lighting, pavement markings and signage, stormwater <br />pollution prevention, construction phasing and staging, access route designation. <br /> <br />Ravenswood Electric Buses Charging Station Implementation, Broward County Transit, Broward, Florida – <br />This project required the topographic survey and underground utility coordination for the implementation of 12 <br />electric bus charging stations at the Ravenswood bus maintenance facility in Dania Beach. This is one of the main <br />facilities in Broward County. Mr. Eckardt was the project manager on this project responsible to provide surveying <br />services and conducted underground utility investigation including research of as-builts, and conducted and <br />coordinated the designation and soft digs required to provide accurate data to the project architect about the civil <br />engineering layout and design requirements. <br /> <br />Miami-Dade Water and Sewer Utility Atlas Update and GIS Implementation Miami Springs, FL - Mr. Eckardt is <br />the Project Manager for this Miami-Dade Water and Sewer Department (WASD) project to provide support services <br />for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami <br />Springs acquired utilities. The main objective of this project is to compile all As-Built Information related to all water <br />and sewer assets of Miami Springs, an area of 1,900 Acres, and upload the information digitally into the WASD GIS <br />System. Mr. Eckardt oversees six full time GIS Specialists working at WASD entering water and sewer utility <br />information and provides monthly updates to WASD management staff. Project also includes field data collection <br />and as-built plans research to collect all the required information necessary for the input of all water and sewer <br />infrastructure of Miami Springs. Mr. Eckardt has been able to successfully execute this project and its completion is <br />ahead of schedule. <br /> <br />NW 138th Street Bridge Over Miami River Canal, Miami Dade Public Works, Miami, Florida - This project <br />included the Master Planning, Topographic Survey, Engineering Design and Construction Administration for NW <br />138th Street, between Okeechobee Road and NW 113th Avenue. This project widens a two-lane undivided roadway <br />to a five-lane undivided roadway section in a highly industrial area. Mr. Eckardt was responsible for the design and <br />coordination required for this project along NW 138th Street between Okeechobee Road and NW 113th Avenue. The <br />design included roadway survey, design, street lighting, paving grading and drainage, traffic signal modifications, <br />striping and a new bridge to replace the existing structure. Mr. Eckardt also provided permitting assistance to Miami- <br />Dade County Public Works Department for this project. Several meetings with FDOT, MDPW, and property owners <br />were required to coordinate the work required for this project. <br /> <br /> <br /> 157