Laserfiche WebLink
VANDERWEILI <br />Firm References and Similar Work Completed <br />- . .......... - - --- - - -- <br />Section F <br />Enclosed within this section please find three relevant projects, three rererences of <br />work within the last five years, and proposed team resumes. All of the projects on the <br />resumes included herein are projects worked on within the last 10 years. <br />Additionally, Vanderweil has 70 years experience in the engineering industry, working <br />with a variety of clients including public and municipal/federal, as well as working in <br />similar climates such as coastal and island environments. These regions have unique <br />engineering challenges. Resiliency of our designed MEP/FP systems and associated <br />buildings is an increasingly important issue due to climate change. As such, the <br />effects of a project's location and climate are considered early in the design process <br />to ensure success. <br />As requested, included below is a list of executed agreements made between the firm <br />and local municipalities, with similar scope to the RFP, within the last (5) years. <br />Executed Contracts Within the Last (5) Years <br />• City of Miami, Department of Environmental Resource Management, <br />Laboratory Fume Hoods Replacement, Miami, FL <br />• U.S. Department of Homeland Security, United States Coast Guard, H Irma <br />Station, Marathon, FL <br />• St. Lucie County Florida, Solid Waste to Energy Conversion Facility, Fort <br />Pierce, FL <br />• University of Miami, Medical Campus Master Plan, Miami, FL <br />• Florida Advanced Manufacturing Research Center, Osceola County, FL <br />19 <br />