My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
VANDERWEI L <br />Location <br />Miami, FL <br />Project Type <br />Laboratory Renovation <br />Building Type <br />Science & Research Facility <br />Size <br />10,000 sf <br />Est. Construction Cost <br />$2,000,000 <br />Project Highlights <br />• New fume hoods <br />• New ducted stainless steel <br />exhaust system with new exhaust <br />fans and new supply ductwork <br />• New chilled water air handling <br />units and VAV terminal boxes with <br />electric re -heat <br />Sustainable Design Features <br />• New high efficiency custom and <br />chilled water air handling unit with <br />VFD's <br />• New HVAC controls throughout <br />the space to control the new <br />VAV boxes, air handling unit and <br />exhaust fans <br />• New fume hoods with VAV controls <br />City of Miami <br />DERM Laboratory Fume Hoods Replacement <br />A $2,000,000 upgrade of existing The upgrades included new chilled <br />laboratories and support spaces on the water air handling units and VAV <br />first floor of the City of Miami's DERM terminal boxes with electric re -heat <br />Laboratory. Eight fume hoods and their Vanderweil provided mechanical, <br />associated mechanical systems were electrical, plumbing, and fire protection <br />replaced. <br />engineering. <br />Labs were retro -fitted with a new ducted <br />stainless steel exhaust system, new <br />exhaust fans and new supply ductwork <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.