Laserfiche WebLink
VANDERWEI L <br />Location <br />Miami, FL <br />Project Type <br />Laboratory Renovation <br />Building Type <br />Science & Research Facility <br />Size <br />10,000 sf <br />Est. Construction Cost <br />$2,000,000 <br />Project Highlights <br />• New fume hoods <br />• New ducted stainless steel <br />exhaust system with new exhaust <br />fans and new supply ductwork <br />• New chilled water air handling <br />units and VAV terminal boxes with <br />electric re -heat <br />Sustainable Design Features <br />• New high efficiency custom and <br />chilled water air handling unit with <br />VFD's <br />• New HVAC controls throughout <br />the space to control the new <br />VAV boxes, air handling unit and <br />exhaust fans <br />• New fume hoods with VAV controls <br />City of Miami <br />DERM Laboratory Fume Hoods Replacement <br />A $2,000,000 upgrade of existing The upgrades included new chilled <br />laboratories and support spaces on the water air handling units and VAV <br />first floor of the City of Miami's DERM terminal boxes with electric re -heat <br />Laboratory. Eight fume hoods and their Vanderweil provided mechanical, <br />associated mechanical systems were electrical, plumbing, and fire protection <br />replaced. <br />engineering. <br />Labs were retro -fitted with a new ducted <br />stainless steel exhaust system, new <br />exhaust fans and new supply ductwork <br />20 <br />