Laserfiche WebLink
E� RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E;for each key person) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />William B. Sellon, CPD, LEED AP Principal-in-Charge, Project a. TOTAL b. WITH CURRENT FIRM <br />Manager 24 24 <br />:15. FIRM NAMEAND LOCATION (Cityand,State) <br />R.G. Vanderweil Engineers LLP, Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />A.S., Mechanical Engineering, Massasoit Community <br />Certified Plumbing Designer, 2002 <br />College, 1998 <br />Certified Medical Gas Inspector - NFPA 99C, 1999, 2002 & 2005 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.) <br />William is an Associate Principal and Regional Director with almost 25 years of experience in client and project management <br />for state-of-the-art government and commercial buildings. He has extensive experience in facility master planning as well <br />as cost and schedule management. He is a diligent and dependable leader able to effectively direct teams, coordinate with <br />contractors, and ensure client satisfaction. <br />PROJECTS19. RELEVANT <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm <br />Role: Principal-in-Charge, Project Manager <br />Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with <br />replacing the existing ductwork. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />U.S. Department of Homeland Security, United States Coast <br />Guard, H Irma Station, Marathon, FL <br />2019 <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE EU Check if project performed with current firm <br />b• <br />Role: Principal-in-Charge, Project Manager <br />Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United <br />States Coast Guard. The site is made up of several buildings, including a two-story administration building, single-story office <br />and storage building, and a boathouse which is a single-story building that houses a repair shop, and storage. The scope of <br />design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and <br />complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />U.S. Department of Veterans Affairs, Health Care Center, <br />Kernersville, NC <br />2013 <br />2015 <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm <br />Role: Principal-in-Charge, Project Manager <br />New 375,000 sf outpatient health center including surgery, sterile processing department, and laboratory suites. Clinics include <br />behavioral health, women's health, radiology, primary care, audiology and pulmonary medicine. Project includes a police <br />department with readiness training room and weapons storage. The building achieved LEED Gold® certification. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />University of Miami, Medical Campus Master Plan, Miami, FL <br />2018 12020 <br />d <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE FXI Check if project performed with current firm <br />Role: Principal-in-Charge, Project Manager <br />MEP/FP engineering, master planning, and technology design services for the University of Miami Medical Campus and satellite <br />buildings in South Florida. The master plan will include a high level overview of the major MEP/FP/T infrastructure to support the <br />Universities projected growth over the next 10 years. <br />53 STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />