|
12. NAME 13. ROLE IN THIS CONTRACT 114. YEARS OF EXPERIENCE
<br />rT_I:...,_ a. TOTAL I b. WITH CURRENT FIRM
<br />BD+C 48 13
<br />15. FIRM NAME AND LOCATION
<br />R.G. Vanderweil Engineers LLP, Miami, FL
<br />16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE)
<br />B.S., Electrical Engineering, University of Havana, 1972 Professional Engineer (Electrical): FL
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.)
<br />Felix is a Senior Electrical Engineer with over 30 years of experience in the field of electrical engineering and lighting
<br />design. He specializes in power distribution and controls, technological upgrades and retrofit, audio, telecommunications,
<br />security and fire protection as well as energy audits and conservation for government and commercial projects.
<br />PROJECTS19. RELEVANT
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br />Role: Electrical Engineer
<br />Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with
<br />replacing the existing ductwork.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />U.S. Department of Homeland Security, United States Coast
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2019
<br />Ongoing
<br />Guard, H Irma Station, Marathon, FL
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />b.
<br />Role: Electrical Engineer
<br />Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United
<br />States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office
<br />and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of
<br />design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and
<br />complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Indian River State College, Building "O" Chiller Plant Upgrades,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2019
<br />Ongoing
<br />Fort Pierce, FL
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm
<br />Role: Electrical Engineer
<br />The "O" Building Chiller Plant serves various buildings throughout the campus including the new 50,000 sf WorkForce Training
<br />Center. The mechanical scope includes replacing existing chiller number 2 and chiller 3, along with the associated cooling
<br />towers and primary and condenser water pumps with two new centrifugal chillers. Electrical scope includes replacing
<br />the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, cooling towers, and pumps.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />University of Miami, Medical Campus Master Plan, Miami, FL
<br />PROFESSIONAL SERVICESCONSTRUCTION
<br />(If applicable)
<br />2018 12020
<br />d
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Role: Electrical Engineer
<br />MEP/FP engineering, master planning, and technology design services for the University of Miami Medical Campus and satellite
<br />buildings in South Florida. The master plan will include a high level overview of the major MEP/FP/T infrastructure to support the
<br />Universities projected growth over the next 10 years.
<br />55 STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|