Laserfiche WebLink
Relevant Project Characteristics <br />New fume hoods <br />• New ducted stainless steel exhaust system <br />with new exhaust fans and new supply <br />ductwork <br />• New chilled water air handling units and VAV <br />terminal boxes with electric re -heat <br />Scope: Mechanical, electrical, plumbing and fire <br />protection engineering design services <br />Size: 10,000 sf <br />Cost: $2,000,000 <br />A $2,000,000 upgrade of existing laboratories and support spaces on the first floor of the City of Miami's DERM Laboratory. Eight fume <br />hoods and their associated mechanical systems were replaced. <br />Labs were retro -fitted with a new ducted stainless steel exhaust system, new exhaust fans and new supply ductwork. <br />The upgrades included new chilled water air handling units and VAV terminal boxes with electric re -heat. <br />Vanderweil provided mechanical, electrical, plumbing, and fire protection engineering. <br />57 STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />