My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Relevant Project Characteristics <br />• MEP drawings and specifications suitable <br />for permit, bidding, and construction <br />administration. <br />• Building controls and fuel systems for the fuel <br />farm including piping, controls, and fuel oil <br />tanks to accommodate the new and demolition <br />layouts of the program. <br />• Power to the new HVAC equipment, <br />switchboards, lighting design, and circuiting <br />• New domestic and hot water; sanitary, vent, <br />condensate, and storm systems. <br />Scope: Mechanical, electrical, plumbing and fire <br />protection engineering design services <br />Size: N/A <br />Cost: Confidential <br />Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States <br />Coast Guard. <br />The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a <br />boathouse which is a single -story building that houses a repair shop, and storage. <br />The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement <br />and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.