<br /> <br />RFQ No. 20-07-01 <br />City of Sunny Isles Beach Beach <br />August 2020 <br /> <br />D – Project Approach and Understanding <br /> <br />The completion of the coordination phase is quickly followed by the pre-design or design <br />phase of the project, depending on the scope of the project. The PDS Team intends to bring <br />the strongest resources to participate in this project to provide in-depth technical evaluation of designer <br />selections, the design products, and design procedures. This will be of great benefit to City because <br />they will receive in-depth technical opinions on which to base project decisions. The PDS Team, as an <br />extension to the City Staff will represent the City in technical discussions with regulatory agencies, other <br />design engineers and contractors. PDS will also schedule, arrange and conduct required meeting with <br />stakeholders. <br />Pre-Design and Design tasks will be initiated, enforcing all our management procedures. We will also <br />conduct detailed design reviews throughout the pre-design and design phase. Several workshops and <br />work sessions will be held including code reviews, inter-discipline coordination meetings, discipline <br />QA/QC reviews, value engineering, constructability reviews, and operability reviews. <br />During all project phases, all related documentation <br />including surveys, technical memos, eMails, meeting <br />minutes, reports, calculations, models, drawings, <br />specifications, details, etc, will be managed and filed <br />electronically and in hard copies (with the exception of <br />eMails). All project documentation may be provided to <br />the City periodically or upon request. <br />Our plan includes regular coordination meetings and <br />progress meetings to ensure and optimize City <br />involvement. We know that the work being done under <br />this project is not the only item of business demanding <br />your time. Therefore, we will conduct efficient <br />meetings using detailed and time-limited agendas. <br />Coordination meetings will be specifically related to individual project activities to ensure input from all <br />stakeholders and will be intended to inform operations staff about any particular outage or operational <br />constraints that may be required during project delivery. During the detailed design phase, the City staff <br />will provide input on materials of construction, specifics on desired equipment features; consider <br />equipment compatibility and reliability, operating and management philosophy, automation <br />procedures, and the like for incorporation into the design. <br />Project control tools will be utilized, such as Primavera products for scheduling and construction <br />management tasks. These products also allow all team members to access project data at anytime. Our <br />project control includes control of costs and detailed projection of construction costs, to help determine <br />budgets. Our professionals are very aware of the recent decline and later gradual increase of our <br />construction industry prices. Our staff is in constant communication with contractors and suppliers. This <br />is very beneficial to the City, since we will be able to provide budgetary estimates that will resemble real <br />construction prices, avoiding over budgeting or under budgeting of construction contracts. <br /> <br />45