Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Luis J. Jurado, P.E. <br />13. ROLE IN THIS CONTRACT <br />Civil Engineering QA/QC <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />17 <br />b. WITH CURRENT FIRM <br />13 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineering, University of North Carolina <br />at Charlotte <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No.66396 - South Carolina No. 28394 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, National Society of Professional Engineers, ASCE Member <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Transit – Professional Services Agreement in an <br />Ongoing Basis, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Jurado was Project Manager and designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus <br />bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater <br />improvements and bus shelter pads. In addition, Mr. Jurado prepared paving, grading and drainage plans to depict proper <br />stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very <br />rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT Minor Highway Transit Enhancements, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Project included design services, permitting and construction management services for the improvement at 73 locations along <br />FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including <br />ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the <br />design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was <br />responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team <br />coordination and rigorous quality control. The project total cost was $2.5 Million. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />FLL Westside Watermain Loop, Broward County Aviation <br />Department, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This water main project was following the Water System Master Plan and was designed by Mr. Jurado as Engineer of Record. <br />Project included the design, permit and Engineering support for the construction of those improvements that this area of the <br />airport requires; consistent with the Water System Master Plan. Design included over 5,000 LF of 16 and 12-inch diameter DIP <br />water mains, with taps, air release valves, pavement restoration including airside concrete apron restoration and all the required <br />coordination. Mr. Jurado also led and supervised engineering during construction services including the preparation of record <br />drawings and final project certification and closeout. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Pembroke Pines City Hall and Civic Center, City of Pembroke <br />Pines, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Jurado was Civil Engineer and prepared engineering drawings for this 115 Acre project development in the City of <br />Pembroke Pines. Project delivered the City Center a mixture of residential, commercial and office facilities. The site is located <br />within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under <br />construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres <br />will provided the community with a City Hall and Civic Center Building, and Commission Chambers Building for public <br />meetings and an Art Gallery Building. Construction Cost: $60M. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Taylor Lane Roadway Improvements, Dania Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Jurado was the Engineer of Record for this project to provide design, permitting and engineering services during <br />construction for the development of a drainage system to help alleviate flooding of this city roadway from stormwater run-off. <br />The project was designed by PDS and permits were obtained from the local governmental agencies. Mr. Jurado’s design <br />included the development of drainage improvements within the roadway and the development of a dry retention area to collect <br />the stormwater run-off from the roadway. PDS was involved in the contractor selection, overseeing the preparation of the <br />contract and ultimate completion of the improvements. <br />52