Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gustavo A. Eckardt. P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />18 <br />b. WITH CURRENT FIRM <br />10 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineering, University of North Carolina <br />at Charlotte <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No.67553 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional <br />Engineers, Primavera P3 Scheduling Training, MOT Training Course <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges and Tunnels, City of <br />Miami Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys <br />at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had <br />a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation <br />of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of <br />land and aerial easements for the new structures in private property. The project total cost is $16 Millions. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miami-Dade Transit Department, ARRA Municipalities Shelters <br />Groups “A & C”, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Project consisted of two transit improvement projects at over 70 locations throughout Miami-Dade County, in the <br />Cities of Homestead, Florida City, North Miami, North Miami Beach, Miami Lakes, Surfside, Bay Harbor Islands, <br />Aventura, South Miami, Opa-Locka, and El Portal. Project was Federally Funded and coordinated by the Miami- <br />Dade Transit Department, and follows all ARRA and Federal guidelines and regulations. Mr. Eckardt was the <br />Construction Manager and Quality Control representative in the project, and assisted in obtaining all permitting <br />approvals from municipalities and county agencies. Project included the ADA accessibility and pedestrian safety <br />improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />MDT A/E Professional Consultant Services for Federally Funded <br />Projects, Miami-Dade County Transit, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt is the Consultant Project Manager in this multi-year contract for Continuous Professional Services for Federally <br />Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work <br />includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, <br />surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, MEP, architecture, transit <br />and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant <br />agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value <br />engineering, project cost estimates and traffic studies. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Executive Airport RIM Taxiway Modifications, Miami-Dade <br />Aviation Department, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. Eckardt is the project manager for this project to design modifications to the existing configuration of Taxiways <br />“A” and “D” as they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt <br />has been responsible for design and coordination of demolition plans, new pavement design, runway and taxiway <br />lighting design, pavement markings and signage, stormwater pollution prevention plans, construction phasing and <br />staging, access route designation. Mr. Eckardt provided construction administration support until closeout. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT Minor Highway Transit Enhancements, Broward <br />County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Project included design services, permitting and construction management services for the improvement at 73 locations along <br />FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including <br />ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the <br />design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Eckardt was <br />the project manager responsible for completing designs and coordinating subconsultants and prepare submittals and address <br />permitting comments. The project total cost was $2.5 Million. <br />53