Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br />A/E Professional Consultant Services for Federally Funded <br />Projects <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Miami-Dade Transit <br />b. POINT OF CONTACT NAME <br />Jesus Valderrama <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />786-469-5291 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Premiere Design Solutions, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />North Miami, FL <br />(3) ROLE <br />Transit Planning, ROW Support, GIS, <br />Inspections, Design & Surveying <br />b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Premiere Design Solutions, Inc. (PDS) currently serves as the Prime Consulting Firm for Miami-Dade Transit <br />(MDT). MDT is the 14th largest public transit system in the USA, and the largest transit agency in the state of <br />Florida. MDT operates a transportation system which consists of four major components: the Metrobus fleet, <br />connecting most areas of Miami-Dade County; Metrorail, an electrically-powered, elevated, rapid-transit heavy rail <br />system stretching 24.6 miles; Metromover, a 4.4-mile elevated people mover that serves the downtown central <br />business district of Miami; Special Transportation Service (STS), designed to meet the needs of people with <br />disabilities unable to use regular transit services. Overall, MDT moves over 353,000 daily (weekday) boardings <br />on Metrobus, Metrorail, Metromover and STS combined. <br />PDS is the prime consultant on this multi-year contract for Continuous Professional Services for Federally Funded <br />Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work <br />includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, <br />permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, <br />systems and mechanical engineering, architecture, transit and transportation planning in accordance with FTA <br />requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, <br />design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates <br />and traffic studies. <br />Premiere Design Solution’s Completed Work Orders Under this Contract Included: <br />•Construction Contracts & Procurement Support Services – Included Buy America Interpretation for <br />Construction Contracts; An internal audit to procurement files to ensure FTA requirements are being met; & <br />Change Order Drafting support services in compliance with FTA. <br />•Existing Lease Management & Transit Oriented Development Support Services – Support to ROW Division to <br />Manage leases on existing transit properties and support to new private transit oriented developments. <br />•Independent Peer Review for Pedestrian Overpass – Design Review of a Steel Pedestrian Bridge over US-1 at University <br />Metrorail Station. <br />•Central Bus Garage Roofing Repairs and Bathroom Renovations – Condition Assessment, Design and Construction <br />Support services for roofing and Bathroom improvements <br />•SR 836 Express Planning Support – Planning services for the update of the Categorical Exclusion document, traffic <br />analysis for the impact associated with the new terminal at FIU and Intersection analysis for the implementation of Traffic <br />Signal Priority and Queue Jumps. <br />•Bus Service and Design Standards – Planning support for the development of MDT Bus Service standards, creating <br />service classes, and the development of Design drawings for MDT standard stops and facilities. Project also includes the <br />generation of a series of Transit maps in GIS system. <br />•Park and Ride at SW 344 Street and the Busway – Performed periodic inspection, construction management and Special <br />inspector as required by the City of Florida City. <br />57