Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER 3 <br />21. TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges and Tunnels, City of <br />Miami Gardens, Florida. <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami Gardens. <br />b. POINT OF CONTACT NAME <br />Brenton Daily, P.E. Bentley <br />Architects + Engineers, Inc. – <br />Prime Consultant. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(407) 331-6116 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Premiere Design Solutions, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />North Miami, FL. <br />(3) ROLE <br />Civil Engineering and Surveying <br />Services <br />b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The City of Miami Gardens has engaged a Design/Build firm to design, permit and construct pedestrian <br />improvements at the Hard Rock Stadium in the City of Miami Gardens, which shall be complete prior to a big event <br />scheduled for February 2, 2020, with a total project cost of $16,000,000. <br />Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of <br />17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to <br />provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps will be constructed in <br />private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the <br />City of Miami Gardens to place proposed ramps in public land. <br />Premiere Design Solutions Staff’s Task in the project is: <br />Topographic Survey <br />Easement Preparation and Coordination <br />Stormwater Management Design <br />Permitting <br />Utility Design and Coordination. <br />58