My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc (reduced)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Premiere Design Solutions, Inc (reduced)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:53:24 AM
Creation date
8/21/2020 10:48:43 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />6 <br />21. TITLE AND LOCATION (City and State) <br />West Side Water Main Loop, Fort Lauderdale, Fl. <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Broward County Aviation <br />Department (BCAD) <br />b. POINT OF CONTACT NAME <br />Alex Lazowick – President – <br />Keith & Associates <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-788-3400 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Premiere Design Solutions, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />Miramar, FL. <br />(3) ROLE <br />Civil Engineering, Permitting, <br />Construction Management <br />b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Project is generally described as follows: design, <br />permitting, bidding and construction phase services for the <br />installation of 16 and 12 inch water main loop that will loop the <br />west, north and east sides of the expanded lease parcels that <br />are south of Taxiway C west and north of Lee Wagner <br />Boulevard. <br />This water main upgrade is required in accordance with the <br />Water System Master Plan prepared by EAC Consulting, Inc. <br />This project included the design, permitting and full time Engineering support for the construction of those <br />improvements that this area of the airport required. This project is also known as phase two of the West Water Main, <br />being an extension of a recently installed phase one West Water Main improvements to the South of this project. <br />The Scope of work of this project includes the following task: <br />Coordination with County and Government to expedite the <br />project. <br />Design and Permitting of the water main system. <br />Utility locating services to meet local system criteria <br />Provide Engineering Services during construction to certify <br />the completion of the project <br />Premiere Design Solutions Staff’s role in the project is: <br />General civil engineering services. <br />Obtaining Engineering Permits for the project. <br />Bidding and awards services. <br />Construction Management and Engineering during <br />construction services. <br />Full time inspections <br />Project Closeout and record drawing preparation <br />61
The URL can be used to link to this page
Your browser does not support the video tag.