My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tab 6 F. Firm References and Similar Work <br />Completed <br />Continuing Professional Consulting Services <br />Request for Qualifications No. 20-07-01 <br />2-Civil Engineers <br />Port Everglades Interior Roadway and Drainage Design <br />Project included the demolition, roadway, and drainage design improvements. The scope of the project <br />included providing a demolition plan for the site showing the limits of demolition for the towers and <br />roadways and providing a new interior roadway with new drainage design. Ross assisted the Project <br />Manger on the interior roadway design and new driveway. Horizontal and vertical geometry of the <br />roadway and new drainage improvements were designed to collect and convey stormwater runoff. <br />Additionally, driveway improvements were permitted through the City of Hollywood to allow for vehicles <br />to have an emergency driveway exit, which is needed for the larger 18-wheel vehicles. A civil 3D model <br />was created for the site which was used to provide plan profile and cross sections for the new roadway. <br />Construction has been completed. <br />Project Owner: Florida Power & Light <br />Project Location: Fort Lauderdale, FL <br />Total Project Cost: $150,000 (Design fees) <br />Contact Information: Greg Hill, Project Manager <br />386-329-4620 / Gregory.hill@fpl.com <br />Project Name: Port Everglades Interior Roadway and Drainage Design via a General <br />Engineering Contract with FP&L <br />Completed – On Time: Yes <br />Completed – On Budget: Yes <br />Number of Change Orders: None <br />Type of Work Performed: Demotion, roadway, and drainage design improvements. <br />Project Dates: (Start/Finish): 2017 / 2019 <br />Ross Team Members: <br />Robert Ross, PE, LEED AP <br />Melissa Ross, MSCE <br />Franklyn Garris <br />Daniel Sanders <br />Philip Mills-Lutterodt <br />Page 58
The URL can be used to link to this page
Your browser does not support the video tag.