My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tab 6 F. Firm References and Similar Work <br />Completed <br />Continuing Professional Consulting Services <br />Request for Qualifications No. 20-07-01 <br />2-Civil Engineers <br />Ingalls Park <br />Complete redesign of the park including design all the drainage and grading for the new sidewalks, parking <br />lot and pavilions. As part of this project, the City Hallandale requested for all of the existing sidewalks <br />surrounding the park to be extended to 8’ sidewalks. Ross Engineering coordinated closely with the <br />Landscape Architect for the relocation of the existing trees as well as relocating existing catch basins. <br />Permits for onsite and offsite were obtained from the City of Hallandale Beach, Broward County EPD, and <br />FDOT drainage connection permit since this site was within 500’ of an FDOT right-of-way. This project is <br />currently under construction. <br />Project Owner: Synalovski Romanik Saye <br />Project Location: Hallandale Beach, FL <br />Total Project Cost: $2,309,902 <br />Contact Information: Manny Synalovski, AIA, LEED AP <br />954-961-6806 / msynalovski@synalovski.com <br />Project Name: Ingalls Park, Hallandale, FL <br />Completed – On Time: Yes <br />Completed – On Budget: Yes <br />Number of Change Orders: None <br />Type of Work Performed: Redesign of park including design, all drainage and grading for new <br />sidewalks, parking, and pavilions <br />Project Dates: (Start/Finish): 2017 / 2019 <br />Ross Team Members: <br />Robert Ross, PE, LEED AP <br />Melissa Ross, MSCE <br />Franklyn Garris <br />Daniel Sanders <br /> <br />Page 59
The URL can be used to link to this page
Your browser does not support the video tag.