My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Ross Engineering, Inc. 17670 NW 78th Avenue, Suite 214, Miami, FL 33015 <br />Task Description <br />100 Professional Surveying Services <br />200 Professional Engineering Design Services <br />300 Permitting Services <br />401 Limited Construction Engineering Support Services <br />402 Certification and Inspections <br />100 PROFESIONAL SURVEYING SERVICES <br />Longitude Surveyors (Longitude) will perform topographic surveying services as per WASD <br />requirements. Longitude is a sub-consultant to Ross Engineering. The Surveying Scope of <br />Services is enclosed as Attachment B – Professional Surveying Services Fee Proposal. <br />Deliverables <br />Signed and sealed topographic surveys <br />200 PROFESSIONAL ENGINEERING DESIGN SERVICES <br />The work proposed in this task will provide for the project’s detailed design development <br />considering elements from the review and evaluation of existing documentation and <br />infrastructure. Site visits will be performed to verify existing conditions, analysis of existing <br />utility locations, review of geotechnical investigations, assess horizontal alignment <br />considerations, incorporation of material selections, and confirm the design criteria upon <br />which the project is to be based. <br />Ross Engineering will prepare simplified project schedules for the duration of the project; as <br />well as prepare and submit progress reports for the duration of the design and permitting <br />phases detailing the services performed. Progress reports will be submitted along with the <br />invoices. <br />201 – 30% Design Submittal <br />For the completion of this subtask, the following are the items and/or activities: <br />Ross Engineering shall prepare construction drawings for review and approval by WASD. The <br />30% design submittal shall consist of 24”x36” drawings with a 20:1 scale and project <br />components including: <br />Review of existing as-builts <br />Coordination with Sunshine One Call of Florida to request design ticket <br />Request utilities for the project limits and incorporate into the plans <br />Perform project site visit <br />Prepare project site narrative <br />Preliminary layout with proposed pipe location and stub-outs <br />Page 90
The URL can be used to link to this page
Your browser does not support the video tag.