My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 58 <br />F. Firm References and Similar Work Completed <br />Education <br />BS, Civil Engineering, <br />Polytechnic Institute J.A. <br />Echeverría <br />Years of Experience <br />22 <br />Licenses <br /> â– Professional Engineer, FL <br />Barbara A. Valdes-Perez, PE <br />Project Engineer <br />Barbara has 22 years of varied experience in the field of civil engineering that <br />include 17 years in Geotechnical Engineering and 5 years in Hydraulic Engineering. <br />Her experience includes designing structures for hydraulic facilities, construction <br />supervision work in small and large buildings, and major public works projects. <br />PROJECT EXPERIENCE <br />I-395 Reconstruction Design-Build, <br />FDOT D6 <br />Miami-Dade County, Florida <br />Barbara serves as a staff engineer during <br />the design and construction phases. <br />Primary duties include test boring layout, <br />utility clearance, drilling coordination, <br />report writing, and rock core data analysis. <br />Project includes the design of a signature <br />bridge, segmental bridges, and viaduct <br />bridges supported on auger-cast pile <br />foundations. <br />I-95 3C Express Lanes Design-Build, <br />FDOT D4 <br />Miami-Dade County, Florida <br />Barbara serves as a staff engineer during <br />the design and construction phases. <br />Primary duties include test boring layout, <br />utility clearance, drilling coordination, <br />report writing, and rock core data <br />analysis. Project includes non-redundant <br />drilled shaft foundations for 8 bridges, <br />concrete and steel piling for conventional <br />and category 2 bridges, roadway <br />improvements, retaining walls, and sign <br />structures.
The URL can be used to link to this page
Your browser does not support the video tag.