My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Protection Engineering, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Protection Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:09:42 AM
Creation date
8/21/2020 11:09:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) <br /> <br />Indian River County Coastal Management Program, Vero Beach, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />ongoing <br />CONSTRUCTION (If applicable) <br />2020 <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Indian River County <br />b. POINT OF CONTACT NAME <br />Eric Charest <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />772-226-1569 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />CPE is currently supporting the County’s Sector 5 Beach and Dune <br />Restoration project, the Sector 3 Beach and Dune Renourishment <br />project, and a request to designate Sector 4 as a Critically Eroded Area <br />(CEA). Sector 5 was historically managed through dune restoration so <br />this was the first beach nourishment project constructed along this <br />stretch of shoreline. Project construction for Sector 5 began on <br />November 4, 2019 and was deemed substantially complete on February <br />28, 2020, with construction observations and support performed by <br />members of CPE. CPE biologists also supported the immediate post- <br />construction biological monitoring, which was conducted in compliance <br />with the FDEP-approved Biological Monitoring Plan. <br />The initial Sector 3 Beach and Dune Restoration Project was <br />completed in three phases between 2010 and 2012 (R-20 to R-55) and <br />a dune repair project was constructed in 2015. CPE staff are currently <br />supporting the permitting effort for the next Sector 3 Beach and Dune <br />Renourishment Project and obtained the FDEP permit in July 2020. We are actively coordinating with USACE to finalize the <br />federal authorization. Additionally, CPE staff are supporting the pre-construction biological monitoring, which is in compliance <br />with the FDEP-approved Biological Monitoring Plan. The anticipated construction start date for the Sector 3 project with <br />tentative plans for 2020 construction. <br />CPE is supporting the County’s request to designate the shoreline between R-51.3 and R-70 as a CEA. The shorelines to <br />the north (Sector 3) and to the south (Sector 5) are already designated CEAs so this area serves as a peripheral segment <br />and may be considered necessary for continuity of management of the coastal system or for the design integrity of adjacent <br />beach management projects, as per Rule. The draft report is currently undergoing internal review before submittal to the <br />County, which, if approved, will qualify this segment of beach for State funding. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a. <br />(1) FIRM NAME <br />Coastal Protection Engineering LLC <br />(2) FIRM LOCATION (City and State) <br />Boca Raton, Florida <br />(3) ROLE <br />Subconsultant for Coastal Engineering <br />Services Contracts <br /> <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />Construction observation during the Sector 5 <br />nourishment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.