|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />LOURDES RODRIGUEZ, AIA
<br />Rodriguez Architects, Inc.
<br />16. EDUCATION (DEGREE AND
<br />Principal-in-Charge/Project Architect 1 34
<br />Bachelor of Architecture from the University of Miami, 1983
<br />Associate of Arts/Architecture from Miami -Dade College, 1980
<br />Architecture
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications,
<br />14. YEARS EXPERIENCE
<br />Coral Gables, FL
<br />I /, UUKKtN I KKUFtJJIUNAL KtUIJ I KH I IUN (� IR It qNL UlJ(:IYLINtf
<br />Architect #11630 /State of Florida
<br />Awards, etc.)
<br />American Institute of Architects,
<br />Florida Crime Prevention Through Environmental Design Practitioner
<br />19, RELEVANT PROJECTS
<br />SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms &
<br />Security/Lighting/Electrical Systems, Replacement of Playground.
<br />STANDARD FORM 330 (REV. 7/2018) PAGE 2
<br />(1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />Miami Southridge Senior High School Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (if applicable)
<br />2017
<br />2017
<br />a.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if project performed with current firm
<br />ROLE: Principal-in-Charge/Project Architect SIZE: 334,000 SF COST: $4,993,926.00
<br />SCOPE: GOB Renovations, Replacement of HVAC/Clg. Tile/Resilient Tile, Upgrades to Electrical & Fire Alarm
<br />Systems, Conversion of 3 -Classrooms to ]-Prep Lab, Remodel of Stem Lab, Paint & Re -roofing of Exterior/Interior
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Scoff Lake Elementary Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2018
<br />I 2018
<br />h
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check If project performed with current firm
<br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility Renovation COST: $3,7509000.00
<br />SCOPE: GOP Project Year 3: Renovations/RemodelinglNew 10 Classroom Prototype Building
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />MDC Homestead Campus Homestead, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2015
<br />2016
<br />C.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />ROLE: Principal4ri-Charge/Project Architect SIZE: Entire Campus COST: $3,250,000.00
<br />SCOPE: Re -Roofing, Waterproofing, Bldg. A HVAC Replacement, Painting, Misc. Renovations/Remodeling
<br />(1) TITLE AND LOCATION (city and State)
<br />(2) YEAR COMPLETED
<br />444 Brickell Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2012
<br />2012
<br />d
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm
<br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire Building COST: $2,813,498.00
<br />SCOPE: Railing Replacement, Facade Renovation/Painting Exterior, New Storefront, New Entrance Canopy, Replace
<br />Entry Stairs, Upgrade Restrooms to comply with ADA, Structural Repairs/Renovations, HVAC Rework
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Mae Walters Elementary Hialeah, FL
<br />PROFESSIONAL SERVICES
<br />1
<br />CONSTRUCTION (If applicable)
<br />2018
<br />2018
<br />e.
<br />(3) BRIEF DESCRIPTION (Briefscope, size., cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm
<br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility COST: $3,927,411.00
<br />SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms &
<br />Security/Lighting/Electrical Systems, Replacement of Playground.
<br />STANDARD FORM 330 (REV. 7/2018) PAGE 2
<br />
|