Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />LOURDES RODRIGUEZ, AIA <br />Rodriguez Architects, Inc. <br />16. EDUCATION (DEGREE AND <br />Principal-in-Charge/Project Architect 1 34 <br />Bachelor of Architecture from the University of Miami, 1983 <br />Associate of Arts/Architecture from Miami -Dade College, 1980 <br />Architecture <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, <br />14. YEARS EXPERIENCE <br />Coral Gables, FL <br />I /, UUKKtN I KKUFtJJIUNAL KtUIJ I KH I IUN (� IR It qNL UlJ(:IYLINtf <br />Architect #11630 /State of Florida <br />Awards, etc.) <br />American Institute of Architects, <br />Florida Crime Prevention Through Environmental Design Practitioner <br />19, RELEVANT PROJECTS <br />SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms & <br />Security/Lighting/Electrical Systems, Replacement of Playground. <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Miami Southridge Senior High School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />2017 <br />2017 <br />a. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: 334,000 SF COST: $4,993,926.00 <br />SCOPE: GOB Renovations, Replacement of HVAC/Clg. Tile/Resilient Tile, Upgrades to Electrical & Fire Alarm <br />Systems, Conversion of 3 -Classrooms to ]-Prep Lab, Remodel of Stem Lab, Paint & Re -roofing of Exterior/Interior <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Scoff Lake Elementary Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2018 <br />I 2018 <br />h <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check If project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility Renovation COST: $3,7509000.00 <br />SCOPE: GOP Project Year 3: Renovations/RemodelinglNew 10 Classroom Prototype Building <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />MDC Homestead Campus Homestead, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2015 <br />2016 <br />C. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />ROLE: Principal4ri-Charge/Project Architect SIZE: Entire Campus COST: $3,250,000.00 <br />SCOPE: Re -Roofing, Waterproofing, Bldg. A HVAC Replacement, Painting, Misc. Renovations/Remodeling <br />(1) TITLE AND LOCATION (city and State) <br />(2) YEAR COMPLETED <br />444 Brickell Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2012 <br />2012 <br />d <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire Building COST: $2,813,498.00 <br />SCOPE: Railing Replacement, Facade Renovation/Painting Exterior, New Storefront, New Entrance Canopy, Replace <br />Entry Stairs, Upgrade Restrooms to comply with ADA, Structural Repairs/Renovations, HVAC Rework <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Mae Walters Elementary Hialeah, FL <br />PROFESSIONAL SERVICES <br />1 <br />CONSTRUCTION (If applicable) <br />2018 <br />2018 <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size., cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility COST: $3,927,411.00 <br />SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms & <br />Security/Lighting/Electrical Systems, Replacement of Playground. <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />