Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />a TOTAL h. WITH CURRENT FIRM <br />MIGUEL A. RODRIGUEZ, FAIA Principal, Quality Assurance Manager 37 1 30 <br />15. FIRM NAME AND LOCATION (City and S <br />Rodriguez Architects, Inc <br />17. CURRENT <br />Coral Gables, FL <br />(STATE AND DISCIPLINE) <br />Bachelor of Architecture from the University of Miami, 1981 Architect: Florida - #AR10099, South Carolina - #05071, <br />Associate of Arts/Architecture from Miami -Dade College, 1978 Georgia - #RA011485, Alabama - #5984 <br />NCARB Certification -#46548 <br />Architecture <br />etc.) <br />Chair &Board Member -State of Florida, Board of Architecture &Interior Design 2012-2019 <br />19. RELEVANT PROJECTS <br />ROLE: Principal -in -Charge <br />SIZE: 9,500 SF COST: $1989660.00 <br />SCOPE: Quality Assurance Review of Construction Documents, Specifi <br />cations &Probable Cost Estimate. <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />(1) TITLE AND LOCATION (Cpy and State) <br />(2) YEAR COMPLETED <br />Tamel Properties Miami Gardens, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2012 <br />2012 <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE FV]Check if project performed with current firm <br />ROLE: Principal -in -Charge SIZE: 27,000 SF addition on exist. 68,000 SF plant COST: $5,688,000.00 <br />SCOPE: Major Renovation/Remodeling, Addition & Re -Roofing to an existing manufacturing plant while allowing Owner <br />to continue operations <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />University of Miami CIMAS Building Key Biscayne, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2017 <br />2018 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />ROLE: Principal, Quality Control Manager SIZE: Entire Facility COST: $250,000.00 <br />SCOPE: Upgrade Restrooms to comply with ADA, Replace existing windows with impact -rated windows, Remove & <br />Replace storefront finishes <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />444 Brickell Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/(applicable) <br />2012 <br />2012 <br />C, <br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE ❑_ Check if project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire Building COST: $2,813,498.00 <br />SCOPE: Railing Replacement, Facade Renovation/Painting Exterior, New Storefront, New Entrance Canopy, Replace <br />Entry Stairs, Upgrade Restrooms to comply with ADA, Structural Repairs/Renovations, HVAC Rework <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />MDC Homestead Campus Homestead, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2015 <br />2016 <br />d <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ZCheck if project performed with current firm <br />ROLE: Principal-in-Charge/Project Architect SIZE: Entire Campus COST: $3,2501000.00 <br />SCOPE: Re -Roofing, Waterproofing, Bldg. A HVAC Replacement, Painting, Misc. Renovations/Remodeling <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Belafonte - Tacolcy Park Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2015 <br />2016 <br />c <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if project performed with current firm <br />ROLE: Principal -in -Charge <br />SIZE: 9,500 SF COST: $1989660.00 <br />SCOPE: Quality Assurance Review of Construction Documents, Specifi <br />cations &Probable Cost Estimate. <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />