Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />ROSI CUTRONE Project Coordinator 7 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Rodriguez Architects, Inc. Coral Gables, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BA in Architecture, Florida Atlantic University, 2017 <br />MS in Const. Management, Florida Int. University, 2011 <br />BA in Studies of Architecture, Florida Int, University, 2009 <br />AA in Architecture, Miami Dade College, 2007 <br />18. OTHER PROFS; <br />Associate AIA <br />19. RELEVANT PROJECTS <br />SCOPE: HVAC Replacement & Re -Roofing <br />STANDARD FORM 330 (REV. 8!2016) PAGE 2 <br />(1)TITLE AND LOCATION (City and State) <br />(2)YEAR COMPLETED <br />South Miami Middle School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2017 <br />I 2019 <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Production Manager SIZE: COST: $2,724,070.00 <br />SCOPE: Remodeling/Renovation to replace existing windows, HVAC units, restrooms; and painting <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Carrie Meek K-8 Center Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2018 <br />2019 <br />I <br />b <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Production Manager SIZE: 4,600 SF COST: $13524,005.00 <br />SCOPE: New four classroom addition with covered walkway connection <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Fienberg-Fisher K-8 Center Miami Beach, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2018 <br />2019 <br />I <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Project Coordinator SIZE: Entire Facility COST: $1,850,000.00 <br />SCOPE: Replacement of Fire Alarm/ Water Coolers, NEW AC, Finishes, Toilet Rooms, Repaint Exterior <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Coral Springs Middle School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if app licable) <br />2019 I <br />N/A <br />d <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Project Coordinator SIZE: Entire Facility COST: $9,345,659.00 <br />SCOPE: HVAC Replacement, Upgrades to Facility, Re -roofing. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />Deerfield Park Elementary School Oakland Park, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2018 <br />N/A <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Project Coordinator SIZE: Entire Facility COST: $53081,727.00 <br />SCOPE: HVAC Replacement & Re -Roofing <br />STANDARD FORM 330 (REV. 8!2016) PAGE 2 <br />