My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Rodriguez Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:13:12 AM
Creation date
8/21/2020 11:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAM YLt I'KUJEL; I b WKIGK t3tb I ILLL15I KA I t YKUHl I tAM'b 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 10 <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (Cltyand State) 22. YEAR COMPLETED <br />Miami Southridge Senor High School - Gaming & Animation Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Illapplicable) <br />2019 2019 <br />a. PROJECT OWNER <br />Miami Dade County Public Schools <br />OF PROJECT AND <br />23. PROJECT OWNER'S INFORMATION <br />Maria Sanchez <br />TO THIS CONTRACT (Include scope, size, and cost) <br />:. YUIN I Uh UUN IHU I I tLtYFIUNt <br />305-238-7213 <br />This project involved the conversion of existing standard classrooms into a suite of computer labs, maker spaces, and a technology <br />collaboration suite/common area. Each space required unique technological specifications, and an emphasis on visibility from common <br />areas into the computer lab spaces. <br />Scopes of work that were included in this project were: <br />• Video Game and Animation Computer Lab � <br />• Business & Information Technology Lab 1 ,' <br />• Mobile App Development Lab <br />• 3D printing/maker space <br />• Technology Collaboration Suite <br />• Convert existing classrooms and hallway into one <br />collaboration room <br />• New electrical outlets and data outlet for new <br />computers and "ticker tape board" <br />• New Windows in existing wall to connect rooms visually <br />• New carpeting <br />SIZE: 12,000 SF <br />COST: $241,855.00 <br />0 <br />L_ <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />N <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(Cltyand Stale) <br />(3) <br />ROLE <br />a <br />Rodriguez <br />Architects, Inc. <br />Coral Gables, F3 <br />Architect of Record <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />b. <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />G. <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />d. <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />e. <br />(1) FIRM <br />NAME <br />(2) FIRM <br />LOCATION <br />(Cltyand State) <br />(3) <br />ROLE <br />f.MA <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.