My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Rodriguez Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:13:12 AM
Creation date
8/21/2020 11:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27, ROLE IN THIS28, <br />CONTRACT <br />(From Section E, Block 13) <br />EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place "X" under project key number for participation in same or similar role.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />Lourdes Rodriguez, AIA <br />Principal -in -Charge <br />City of Miami - Continuing Contract <br />X <br />X <br />X <br />City of Coral Gables <br />X <br />X <br />10 <br />X <br />X <br />Miguel A. Rodriguez, FAIA <br />Principal, Quality Assurance <br />Manager <br />X <br />X <br />X <br />X <br />X <br />Antonio Moreno <br />Senior Project Manager <br />X <br />X <br />X <br />X <br />Cuauhtemoc Valle <br />Production Manager <br />X <br />X <br />X <br />Rosi Cutrone <br />Project Coordinator <br />X <br />X <br />X <br />Ernesto Aloma, PE <br />Principal -in -Charge <br />X <br />Jose I. Martinez, PE <br />Sr. Mechanical Engineer <br />X <br />Hector J. Castillo, PE <br />Electrical Engineer <br />X <br />Armando Sales, PE <br />Principal -in -Charge <br />X <br />X <br />29. EXAMPLE PROJECTS KEY <br />NO. <br />TITLE OF EXAMPLE PROJECT FROM SECTION F <br />NO. <br />TITLE OF EXAMPLE PROJECT FROM SECTION F <br />1 <br />University of Miami -Master Agreement <br />6 <br />MDCPS - Modular Building Program <br />2 <br />MDCPS - A/E Continuing Contract <br />7 <br />DMS - Continuing Contract <br />3 <br />MDC - A/E Continuing Contract <br />8 <br />City of Miami - Continuing Contract <br />4 <br />SBBC - A/E Continuing Contract <br />9 <br />City of Coral Gables <br />5 <br />Miami Dade - Continuing Services Agreement <br />10 <br />Miami Southridge SHS - Gaming and Animation <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.