Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO ANTONiO <br />Bid Pack 9 infrastructure improvements <br />Oakland Park, Florida <br />Senior Inspector. Approx 570 acres, included drainage improvements, water main replacement, sewer forcemain replacement, <br />rehabilitation of Lift Station B-2, 3 & 4, sidewalk installation, roadway improvements & resurfacing. Drainage improvements included <br />swales, underdrains, stormwater conveyance system piping networks and exfiltration trenches. Cost $9,640,779.41 <br />2015 2015 <br />Expanded lloyd Estates Residential and industrial improvements <br />Oakland Park, Florida <br />Senior Inspector. Project included drainage improvements, watermain replacement, installation of flood gates, stormwater pump station <br />and a tidal check valve. The proposed drainage improvements include construction of roadside swales, construction of new stormwater <br />conveyance system, piping networks and exfiltration trenches, modification of the existing conveyance systems & construction of new <br />outfall structures that discharge into the Sleepy River. Cost $7,832,907.90 <br />2015 2016 <br />101