Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 VicTOR MuRphy <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />VICTOR MURPHY <br />calvin, Giordano & Associates, inc. <br />instituto Superior de ciencias Medicas de Villa clara <br />Fort Lauderdale, FL <br />Cuba <br />TIN# M612873670100 <br />CTQP: Asphalt Paving Level 1; Concrete Field Tech Level 1; Earthwork Level 1; Earthwork Level 2; Final Estimates Level 1 <br />Other: ACI Level 1 (Concrete Field); FDOT ITS Managed Field Ethernet Switch Training; FDOT ITS Road Weather Information System Training; <br />FDOT ITS Microwave Vehicle Detection System Training; FDOT ITS Closed-Caption Television Training; FDOT ITS Dynamic Message Signs <br />Training; Hazmat; Nuclear Gauge Safety Training; Intermediate MOT; MSE Wall & Auger Cast Piles; Security Awareness Course; Stormwater, <br />Erosion and Sedimentation Control <br />INSPECTOR 4 1 <br />MDX; D/B SR-836 Operation, capacity and interchange improvements <br />Florida <br />Proj No. 83628.050 (Cost $149 M): Proj elements include: the addition of EB/WB lanes to SR-836 from W of 57th Ave to E of 17th Ave, <br />implementation of C-D Rds to the major interchanges at 57th Ave, 42nd Ave (LeJeune Rd), 37th Ave (Douglas Rd), 27th Ave, & 17th <br />Ave, & replacement of the ITS Backbone, as well as the ORT facilities in the system. Improved the level of service & safety features, <br />provided additional capacity on the SR-836 mainline & operational movements in & around the existing interchanges. Responsible for <br />performing MOT verification checks, measurements, calculating quantities, material sampling, performing densities, erosion control <br />checks, checking cross slope depth & width, & assisting Sr Insp. while testing for concrete, roadway drainage, highway lighting, fencing, <br />& guardrails, as well as maintaining accurate Proj records. Responsible for inspections of electronic tolling, DMS, installation of fiber <br />optic trunk for the project, installation of CCTV poles with cabinets, installation of lighting, signalization, pull boxes, & power service. <br />2017-2019 2019 <br />i-95 Express; phase 3A; project FM # 433108-4-52-01 <br />Florida <br />Inspector. This phase will extend the existing express lanes north from just south of Broward Boulevard to just north of Commercial <br />Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two express <br />lanes in each direction. This project includes ramp signalization from Hallandale Beach Boulevard to Commercial Boulevard. Other work <br />includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at <br />locations along I95 Southbound between Broward Boulevard and NW 6th Street, and along I-95 Northbound between Powerline Road <br />and Commercial Boulevard. Victor was responsible for densities for MSE walls, embankment, ITS improvements inspections, subgrade, <br />base; concrete testing, barrier wall, MSE wall placement, drainage, MOT reviews. Cost: $149 Million <br />2020 2020 <br />Florida’s Turnpike Enterprise, South Florida DMS improvement and Replacement <br />Florida <br />Project FM # 435605-7-52-01: Inspector. Project consists of the construction of new ADMS structures and demolition of existing units <br />along the approach streets to Sawgrass Expressway, Homestead exits at 288 Street and 137 Avenue, and Lake Worth Road. New CCTV <br />poles will be installed with ITS cabinets with transfer switch and generator pads. The project also consists of fiber installation using open <br />trench and directional bore, splicing new power services, and replacement of Large walk-in DMS units over the Turnpike mainline. <br />2020-Ongoing <br />102