Laserfiche WebLink
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS <br />In-house CGA services provided for this project: <br />2013 - 2017 2017 <br />07 <br />DANIA eNTeRTAINMeNT CeNTeR, LLC <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />Dania jai-Alai Onsite & Offsite Improvements <br />joaquin Gerlero 954.600.8397 <br />Dania Beach, FL <br />CEO & Founder F3 Architecture <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />N/A Acres <br />$ 766,000.00 <br />$ 3,000,000.00 <br />CGA provided site development services for the onsite and offsite improvements <br />required to upgrade the existing Jai-alai facility to accommodate a casino. Design, <br />permitting, construction oversight, and closeout for new offsite water mains, onsite <br />service connections for water and sewer, site circulation, coordination of utilities, <br />drainage connections, two new entrances to the property, a revamped valet drop-off <br />area as well as offsite roadway improvements to the adjacent city owned Fronton <br />Boulevard were part of the project. The improvements on Fronton Boulevard required <br />the design of a completely new storm water collection system to accommodate the <br />roadway widening as the existing system was either undersized or in bad condition. <br />New street lighting, irrigation and landscaped medians were installed to complete <br />the corridor’s upgrade. <br />The demand of the upgraded facility and requirements of the developer’s agreement <br />with the City required 1,570 LF of 8” and 1,270 LF of 12” water main upgrades to the <br />City’s transmission mains, new fire hydrants both onsite and offsite, and multiple new <br />service and irrigation connections for the project site. City, Health Department and <br />FDOT permitting and certifications were required for the new water main installation <br />and operation. The new 8” sanitary sewer lines required close coordination with the <br />proposed water main, existing and proposed storm drain laterals, the fire lines, MEP <br />connections and underground electrical, gas, and communications for the building. <br />CGA provided surveying, planning, civil and electrical engineering, landscape <br />architecture and construction oversight for the improvements required to upgrade <br />the existing Jai-alai facility to accommodate a casino. <br />X X <br />X <br />X <br />X <br />112