Laserfiche WebLink
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS <br />In-house CGA services provided for this project: <br />08/2014 - Ongoing N/A <br />22 <br />CITY OF SUNNY ISLeS BeACH <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />Sunny Isles Beach emergency Seawall Replacement <br />Bill evans 305.792.1773 <br />Sunny Isles Beach, FL <br />Assistant City Manager BEvans@sibfl.net <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />N/A Acres <br />$ 138,285.00 <br />$ 1,300,000.00 <br />On August 4, 2014, Calvin, Giordano & Associates, Inc. was contacted by the City of <br />Sunny Isles Beach to assist in providing emergency services to replace a collapsed <br />portion of seawall along the City’s picturesque Intracoastal Park. The seawall <br />had suffered from deteriorated tie-backs and had exceeded its useable life. The <br />August rains had increased the loading on the wall, causing the wall to rotate into <br />waters adjacent to the Intracoastal Waterway. CGA environmental staff immediately <br />obtained emergency authorization from the jurisdictional agencies to begin repairs, <br />keeping DERM the USCOE, and DEP continuously apprised of all activity. CGA quickly <br />responded to the City’s request for design, permitting and construction inspection of <br />the emergency demolition and replacement. Due to the age and deteriorated state, <br />the entire 669 linear feet of seawall needed to be replaced. <br />CGA quickly prepared plans and applications for submittal to DERM, USACE and the <br />City Building Department for review and approval. CGA expedited the permit review <br />process while the Contractor was on-site performing emergency repairs. <br />CGA also provided construction engineering and inspection services throughout the <br />duration of demolition and construction. <br />X <br />X <br />127