Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS <br />2016 N/A <br />01 <br />cOMMUNITY, cONDOTTE, DE MOYA <br />US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering <br />FDOT 826 / I-75 Expressway Lanes <br />Antonio Diaz 786.543.7166 <br />Florida <br />US Utility Potholing & Air Excavation was requested to locate mark and physically <br />verify existing utilities that may be of conflict with proposed mast arms. We verified <br />the utilities with the use of vacuum excavation methods and depths measured with <br />grade rod. Our crews collected data and marked with either PK Nails and Paint or <br />Stake and Feather for the survey crews to shoot. <br />This is an ongoing contract and work as needed by client. <br />209