Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS <br />2016 N/A <br />02 <br />FDOT <br />US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering <br />FDOT I-95 Expressway <br />Abraham Hadad 305.207.6845 <br />Broward County, Florida <br />US Utility Potholing & Air Excavation was responsible for collecting SUE Data to <br />aid in the design and installation for future foundations for the widening of I-95 <br />Expressway. We were requested to locate mark and physically verify existing <br />utilities that may be in conflict with proposed foundations on the widening of I-95 <br />Expressway Overpasses. Requested utilities were verified with the use of vacuum <br />excavation methods and depths measured with grade rod. Our crews collected data <br />and marked with either PK Nails and Paint or Stake and Feather along with providing <br />the Surveying Firm of Hadonne a detailed report of utilities located. <br />Cost of our services on this project were $18,970.00 <br />210