Laserfiche WebLink
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) <br />Engineering Services (Ongoing) <br />655-96th Street <br />Bal Harbour, Florida 33154 <br />Point of Contact: <br />Mike Alvarez, CGC, PWLF <br />Utility Compliance Officer <br />Phone Number: <br />786.566.3562 <br />Email Address: <br />MAlvarez@balharbourfl.gov <br />CGA has provided continuing professional services to the <br />Bal Harbour Village since 2017. Services include: <br />Calvin, Giordano & Associates, Inc. (CGA) began providing <br />professional services to Bal Harbour Village in 2017. Currently, <br />CGA has a Continuing Engineering Services Agreement with <br />Bal Harbour Village in order to assist the Village in various <br />design projects and plan review services. These services <br />include Civil Engineering, Electrical Engineering, Surveying, <br />GIS, and Construction Services. <br />On-going services for Bal Harbour Village: <br />• Building Department Public Works Plan Review and <br />Utilities Plan Review <br />• Sunshine 811 Services – Manage Dig Tickets and <br />Design Ticket Response <br />• Florida Department of Environmental Protection <br />– NPDES Annual Reporting, MDC MS4 TMDL <br />Prioritization Plan and Assessment Plan <br />• Miami-Dade County Department of Regulatory and <br />Economic Resources Reporting – Sanitary Sewer <br />System Modeling and Water Usage Reporting <br />• GIS Database Verification and Updates – Water, <br />Sewer, Drainage, and Site Lighting <br />• Current Design / Construction Projects <br />• P.S. No. 1 Drainage Improvements – Project <br />Management, Bidding, Engineering During <br />Construction, and Construction Services <br />• Phase-3(a) Infrastructure Improvements – Project <br />Management, Civil Engineering Design, Bidding, <br />Engineering During Construction, and Construction <br />Services <br />• Phase-2(b) Water Main Replacement – Project <br />Management, Exploratory Investigation via <br />Geotechnical Engineering and Subsurface <br />Underground Exploratory <br />• Park Dr. 16” WM Abandonment and Replacement <br />Review – QA/QC of the design plans, Construction <br />Services. <br />237