Laserfiche WebLink
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />JENNA MARTINETTI, PE <br />Calvin, Giordano & Associates, inc. <br />B.S., Civil engineering, Magna Cum Laude Professional engineer Florida <br />Fort Lauderdale, FL <br />Florida State University, Tallahassee, FL No. 69035 <br />Ms. Martinetti has over 16 years of engineering experience designing and managing projects within many local municipalities. Her roadway <br />design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood <br />enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water <br />pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the <br />quality control process, and local agency program (LAP) coordination, including agency certification assistance. She has the advanced <br />maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and LAP projects <br />including Transportation Enhancement Program and CIGP. Her project management experience also includes design and retrofit of parks, <br />roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and <br />stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out. <br />OVERALL PROJECT MANAGER 16 16 <br />Nova Drive Complete Streets improvements Project <br />Davie, Florida <br />Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor <br />from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a <br />roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, <br />MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and almost complete with construction. <br />A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town <br />Engineer: Jonathan Vogt, PE (954) 797-1137. Construction Cost: ($6.9M), Firm Fees: $459,475 <br />2014 - Ongoing 2020 <br />Broad Causeway LAP Project <br />Bay Harbor Islands, Florida <br />Senior project manager for design and construction document preparation for adding a paved shoulder to the Causeway and replacing <br />the pedestrian handrail along the waterways bridge. The project is an FDOT Local Agency Program (LAP) funded project requiring <br />coordination and submittals to FDOT D6, including using their electronic review comment (ERC) system, as required due to the federal <br />funding. Assisting the Town with their LAP Certification process is also included. <br />2017 Ongoing <br />Rickenbacker Causeway <br />Miami-Dade County, Florida <br />In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker <br />Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic <br />survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected <br />multi-use path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches <br />requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified <br />impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and <br />South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for <br />the widened bridge and new multi-use paths. <br />2013 - 2014 2014 <br />32