h.
<br />19. RELEVANT PROJECTS (CONT.)
<br />f.
<br />e.
<br />d.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
<br />Fronton Boulevard improvements
<br />Dania Beach, Florida
<br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a
<br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd
<br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent
<br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements
<br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and
<br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees -
<br />$766,000
<br />2013 - 2016 2016
<br />Davie Road Phase ii Corridor enhancements
<br />Davie, Florida
<br />Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median
<br />within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement
<br />marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP)
<br />funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design
<br />services for this federally funded project required close coordination with the FDOT and CEI team.
<br />2015 - 2018 2018
<br />Rolling Oaks Park
<br />Miami Gardens, Florida
<br />Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas
<br />within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding
<br />neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters
<br />of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail
<br />improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future
<br />master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom-
<br />designed way-finding signage for all of the trailhead signs, directional signs, and mile markers.
<br />2012 - 2015 2015
<br />Davie Road Phase i Roadway improvements
<br />Davie, Florida
<br />Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane
<br />section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan,
<br />ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree
<br />removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town
<br />project on a County owned roadway.
<br />2013 - 2016 2016
<br />SR 870/Commercial Boulevard, FDOT District iV
<br />Tamarac, Florida
<br />Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing,
<br />signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic
<br />monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016.
<br />2011 - 2016 2016
<br />33
|