Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi <br />Fronton Boulevard improvements <br />Dania Beach, Florida <br />Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a <br />casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd <br />were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent <br />park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements <br />as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and <br />drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - <br />$766,000 <br />2013 - 2016 2016 <br />Davie Road Phase ii Corridor enhancements <br />Davie, Florida <br />Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median <br />within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement <br />marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) <br />funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design <br />services for this federally funded project required close coordination with the FDOT and CEI team. <br />2015 - 2018 2018 <br />Rolling Oaks Park <br />Miami Gardens, Florida <br />Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas <br />within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding <br />neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters <br />of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail <br />improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future <br />master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom- <br />designed way-finding signage for all of the trailhead signs, directional signs, and mile markers. <br />2012 - 2015 2015 <br />Davie Road Phase i Roadway improvements <br />Davie, Florida <br />Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane <br />section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan, <br />ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree <br />removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town <br />project on a County owned roadway. <br />2013 - 2016 2016 <br />SR 870/Commercial Boulevard, FDOT District iV <br />Tamarac, Florida <br />Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing, <br />signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic <br />monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016. <br />2011 - 2016 2016 <br />33